He maha ngā huarahi e taea ai e tētahi rōpū te whakamana i tētahi whakataunga whakatau i raro i te Construction Contracts Act 2002 (te Ture ), ā, he tino uaua ki te ātete i te whakamana. Heoi anō, kei reira ētahi kōwhiringa i runga i te tikanga whakamana e whakamahia ana.
Ka taea hoki te whakahē i te whakataunga a te kaiwhakawā (i ētahi wā) mā te arotake ā-ture i roto i te Kōti Matua.
Ko te kaupapa o tēnei Aratohu he whakarato i tētahi whakarāpopototanga o ngā huarahi hei ātete i te whakatinanatanga o ngā ture, ā, me pānui tahi me te Aratohu Whakatinanatanga mō ngā Tautohenga Hanga Whare i raro i te Ture Kirimana Hanga 2002.
Ngā mihi nui ki ngā kaihautū o te putanga taketake o te Aratohu: Russell McVeagh rāua ko Haggie Law