Whakataunga
He tukanga whakatau tautohe whaimana te whakatau tautohe, e whakaae ana ngā rōpū ki te tuku i tā rātou tautohe ki tētahi tangata motuhake e kiia nei ko te kaiwhakatau tautohe, kia puta he whakatau here. Kei raro i te Ture Whakatau Tautohe 1996 me ngā Ture Whakatau Tautohe BDT te tukanga. Ko te whakataunga a te kaiwhakatau tautohe (he whakatau), ka herea ngā rōpū, ā, ka taea te whakamana hei whakatau a te Kōti.
Tirohanga Whānui o te Tukanga
Mā te whakatau tautohe ka whakawhiwhia ngā rōpū ki te mana ki te whiriwhiri i tā rātou kaiwhakatau, te wāhi me te wā o te whakawa (mēnā ka hiahia rātou ki te whakahaere), me ngā tikanga whakatau tautohe, ka taea te whakarite kia rite ki te āhua me te uaua o te tautohe. (Kotahi, neke atu rānei ngā kaiwhakatau tautohe e kiia ana ko te 'tari whakatau tautohe'. Ka kōrerohia te 'kaitautoko' hei 'tari whakatau tautohe'.)
Te tīmatanga o te tukanga
Me whakaae ngā rōpū ki te whakatau i te take. Ka taea e rātou te mahi i tēnei i mua atu, i muri rānei i te putanga mai o te tautohe.
Te whakatūnga o tētahi kaiwhakatau (taraipiunara whakatau)
Ko te tikanga ka whakatūria te kaiwhakatau i roto i ngā Rā Mahi e 3.
Huihuinga mō ngā Tohutohu
Ko te kaupapa o tēnei hui he whakatairanga i te whakahaere whai hua o te tukanga.
Te tukunga o te keehi
Ka tukuna e ia rōpū he tauākī tuhituhi e whakamārama ana i ngā meka, ngā taunakitanga, me ngā tautohe ture.
Whakarongo
Tērā pea ka whakahaerehia he whakawakanga ōkawa, ahakoa he mea noa anō hoki ka whakahaerehia ngā whakataunga mō ngā tuhinga me te kore he whakawakanga.
Ngā kōrero tāpiri, ngā haerenga ki te papaanga me ngā tirotirohanga
Ka āhei te kaiwhakatau te tono atu i ētahi atu kōrero mai i tētahi rōpū.
Tohu
Ko te kaiwhakawa te kaiwhakatau i tā rātou whakatau, e herea ai ngā rōpū.
Te utu o te whakatau tautohe
Ko tā mātou arotahi he whakarato i ngā otinga tukanga e rite ana ki te utu. Kimihia ētahi atu kōrero mō te utu o te whakatau tautohe.
Hipanga 1. Te tīmatanga o te tukanga
Hei tīmatanga, me whakaae ngā taha e rua ki te whakamahi i te whakatau tautohe.
Ka taea e rātou tēnei mā te hainatanga i tētahi whakaaetanga whakatau tautohe i muri i te ara ake o tētahi tautohe.
Tērā pea kua whakaurua e ngā rōpū te tauira whakatau tautohe a te Taraipiunara Tautohe Hanga Whare ki roto i tā rātou kirimana. Mā tēnei ka taea te whakatau i ngā whakahē, i ngā tautohe rānei ā muri ake nei mā te whakatau tautohe. Mena i pērā rātou, me tuku e te tangata e hiahia ana ki te tīmata i te tukanga (e kiia nei ko te kaitono) he Pānui Whakatau Tautohe hei whakamōhio atu ki te rōpū kē (te kaiwhakautu) e hiahia ana rātou kia whakatauhia te tautohe mā te whakatau tautohe.
Hei tīmatanga i te tukanga, ka tono te kaitono ki te BDT. Kātahi ka tohua he Kai-rehita ki te take hei āwhina i ngā rōpū, ā rātou kaitohutohu, me te taraipiunara whakatau tautohe puta noa i te tukanga whakatau tautohe.
Hipanga 2. Te whakatūnga o tētahi Taraipiunara Whakatau Take
Ko te Taraipiunara Taupatupatu Hanga Whare (BDT) te kawenga mō te whakatū i te taraipiunara whakatau tautohe mēnā kāore anō kia whakaae ngā rōpū ki te tangata e hiahia ana rātou ki te whakatū.
Kotahi te kaiwhakatau mō te whakawakanga whakatau, engari i ētahi wā, ka taea te whakatū i tētahi whakawakanga tokotoru. Ka whakatūria e te BDT tētahi wā ina whiwhi ia i tētahi tono kua oti me te utunga o te pūtāhui mō ngā utu me ngā whakapaunga a te whakawakanga whakatau.
Mena he tangata motuhake kei roto i te hinengaro o ngā rōpū, me tutuki i taua tangata ētahi paearu, ā, me whakaae a BDT he tangata tika ia, he tangata motuhake, he tangata kore whakaaro tika.
I te wā e whiriwhiri ana i tētahi kaiwhakatau, ka whakaarohia e te BDT ngā āhuatanga maha pērā i ngā whakaaetanga i waenganui i ngā rōpū, te āhua me te uara o te tautohe, me te wātea o te tangata hei whakahaere i te take me te whai hua. Me noho kore whakaaro, me motuhake hoki te kaiwhakatau kua tohua ki ngā rōpū. Ko ngā whakatūnga katoa a te BDT he whakamutunga, ā, ka whakaūtia mā te Pānui Whakatūnga i tukuna e te Kai-Rehita.
Kia mōhio: E whakamahia ngātahitia ana ngā kupu kaiwhakatau me te taraipiunara whakatau.
Hipanga 3. Huihuinga tohutohu
I te nuinga o te wā, ka whakarite te kaiwhakatau i tētahi hui tuatahi. Ko te kaupapa o tēnei hui he kōrero mō te wātaka me ngā taipitopito tukanga, pērā i ngā mōhiohio e whakamahere ana ngā rōpū ki te whakarato me te wā. Mā tēnei huarahi matatau ki te whakahaere i te keehi ka āwhina i te katoa kia mārama ki ngā mea ka tū me te wā, ā, ka akiaki i te tukanga kia rere pai, kia whai hua hoki.
Hipanga 4. Te tuku i te keehi
Whai muri i te hui tuatahi, me whakarite e ia rōpū ā rātou tono take, ā, me tuku atu ki te kaiwhakawa me ngā rōpū katoa e whai wāhi ana. Me whakauru ki roto i tēnei tono ngā tuhinga tautoko me ngā taunakitanga katoa e tika ana.
Me whakamārama mārama te tukunga take i te āhua me te pūtake o te tautohe, ngā take me ngā take ture, te tūnga o ia rōpū mō ēnei take, me ngā putanga e rapua ana e rātou. Mena he kirimana kei roto, me whakauru he kape, he wāhanga rānei e tika ana. Hei tāpiri, me whakauru ki te tukunga ngā kōrero, ngā pūrongo, ngā tuhinga, ngā taunakitanga rānei e whakawhirinakihia ana e te rōpū hei tautoko i ā rātou tautohe.
Ko te tikanga, ko te tukanga whakawhiti ka whai ake:
- Te(ngā) kaitono e tuku ana i tā rātou kereme;
- Te hunga whakautu e tautoko ana i tā rātou tiaki; me
- Ko te/ngā kaitono e tuku ana i tētahi whakautu.
Hipanga 5. Whakarongo
Kia oti ngā tuhinga katoa e tika ana te whakawhitiwhiti a ngā rōpū, ā, ki te kore rātou e whakaae kia haere tonu i runga i aua tuhinga anake (me te kore he whakawakanga), ka whakaritea he whakawakanga ōkawa.
I te nuinga o te wā, ka taea e ngā rōpū te whakapuaki i tētahi kōrero whakatuwheratanga poto i mua i te uiuinga whakawhiti i ngā kaiwhakaatu. Ko ngā taunakitanga a ngā kaiwhakaatu ka tangohia i te nuinga o te wā kua pānuitia, arā, kāore he take kia whakaatu ā-waha te kaiwhakaatu i ā rātou taunakitanga matua. Engari, ka arotahi te whakawa ki te uiuinga whakawhiti i te kaiwhakaatu i runga i tā rātou kōrero a ngā kaiwhakaatu i tuhia. Ka taea hoki e te taraipiunara whakatau tautohe te pātai i ngā kaiwhakaatu katoa.
Ka taea te tuku i ngā tāpaetanga whakamutunga i te mutunga o te whakawakanga, i te nuinga o te wā ka tuhia i muri i te rā whakawakanga.
Hipanga 6. Ngā kōrero tāpiri, ngā haerenga ki te papaanga me ngā tirotirohanga
Ka taea e te kaiwhakatau te tono atu mō ētahi atu kōrero i ngā wā katoa i mua i te whakatau (te whakatau), hei tauira, mēnā ki tā rātou whakaaro kāore i te tino taipitopito, i te tino mārama rānei ngā kōrero a ngā rōpū kia taea ai e rātou te whakatau tika me te whai whakaaro.
Ina tukuna mai ētahi atu kōrero e tonoa ana, ka whai mana ngā rōpū katoa e whai wāhi ana ki te tautohe ki te tuku whakautu. Me tuku tēnei whakautu ki te kaiwhakawa (mā te BDT) me ngā rōpū katoa.
I ētahi wā, me toro atu, me tirotiro rānei te wāhi, inā koa mēnā he rawa ā-tinana, he wāhi noho, he āhuatanga rānei e tika ana kia tirohia tuatahitia kia mārama ai, kia aromatawaitia ai hoki. Mā tēnei ka taea e te kaiwhakawa te kite i te kaupapa o te tautohe i roto i tōna horopaki tūturu, ā, ka taea ai te whakatau whai whakaaro me te tika ake.
Hipanga 7. Tohu
Ko te taraipiunara whakatau tautohe te kawenga mō te whakaputa i tētahi whakataunga hei whakatau i ia take tautohenga kua tukuna ki a ia.
Ka puta tēnei i muri i te arotake mārire i ngā tuku kōrero, ngā tuhinga, ngā taunakitanga i homai e ngā rōpū, ngā mōhiohio katoa mai i te whakawakanga, me ngā mōhiohio tāpiri katoa e tonoa ana.
Ki te kore ngā rōpū e whakaae ki tētahi atu mea, ka tukuna te whakataunga mā te tuhituhi, ā, kei roto hoki he whakamārama mō ōna take. He herenga ture te whakataunga, ā, ka taea te whakamana mō ngā rōpū katoa o te whakatau tautohe.
Te Arotake i te Tohu
E whakapau kaha ana te Taraipiunara Taupatupatu Hanga Whare ki te whakarato ratonga whakatau tautohe pumau, tino tika, me te ngaio o te paerewa teitei rawa atu. Ki te kore tetahi rōpū e whakahē, ka tirotirohia ia whakataunga e tetahi o ngā kaiarotake kounga kua whakangungua turetia o te BDT i mua i te hoatutanga ki ngā rōpū. He tukanga whakaū kounga tēnei, ā, he wāhanga matua o te ratonga.
Ko te aro turuki i tētahi whakataunga he mea hei tautuhi i ngā hapa tatau, ngā hapa tuhituhi, ngā hapa tā, ngā hapa ōrite rānei, me ngā hapa āhua.
Ka taea e te BDT te kukume i te aro o te kaiwhakatau ki ngā āhuatanga whai kiko, ngā āhuatanga rerekētanga ā-roto rānei o te whakataunga, engari kāore tēnei e pā ki te mana motuhake me te mana motuhake o te kaiwhakatau. Nā te kaiwhakatau te whakataunga.
Ngā taahiraa e whai ake nei
Whakapā mai
Whakakīia te puka hei whakapā atu ki tā mātou tīma kia kite ai me pēhea mātou e āwhina ai, e whakapā mai rānei ki a mātou mō tētahi o ēnei e whai ake nei:
Waea: +64 9 486 7143
Waea Koreutu: 0508 WHARE
Waea Koreutu: 0508 284 534
Ngā Hāora Tari: Mane ki te Paraire 8:30 i te ata ki te 5:00 i te ahiahi (haunga ngā hararei tūmatanui)