Tauira Whakatau Whakatau
Me whakarite kia whai hua, kia taurite hoki te whakautu a muri ake nei mēnā ka ara ake he tautohe.
I tēnei whārangi
Tirohanga Whānui
He kōwhiringa kei te wātea i runga i te hiahia o ngā rōpū kia haere tonu te whakatau tautohe i runga i te kaupapa motuhake i raro i te Ture Whakatau Tautohe 1996, i raro rānei i ngā Ture Whakatau Tautohe BDT.
Tauira whakatau mō ngā tautohe ā muri ake nei (Ngā Ture Whakatau Tautohe BDT)
Kei te rapu koe i tētahi rarangi hei whakauru ki tō kirimana e whai ake nei? Whakamahia tā mātou tauira rarangi hei uru atu ki te tukanga whakatau tautohe tino tika mēnā ka ara ake he tautohe ā muri ake nei
Tauira whakatauira mō ngā tautohe ā muri ake nei (ā-wā)
He pai ake ki a koe tētahi tukanga whakatau tautohe motuhake i raro i te Ture Whakatau Tautohe 1996? Whakamahia tēnei tauira rarangi hei uru atu ki te whakatau tautohe motuhake ā muri ake nei.
Ngā tautohe o nāianei
Ka taea e ngā rōpū o tētahi tautohe o nāianei te whakaae kia tukuna ki te whakatau tautohe, i raro i ngā Ture Whakatau Tautohe BDT, hei whakatau tautohe motuhake rānei i raro i te Ture Whakatau Tautohe 1996. Tirohia te tauira whakaaetanga whakatau tautohe i raro nei.
Tirohanga Whānui
Ka tūtohu mātou kia whakaurua tētahi o ngā tauira whakatau tautohe e rua e whai ake nei ki roto i tētahi kirimana kia taea ai e koe te uru atu ki taua tukanga a muri ake nei i mua i te ara ake o tētahi tautohe.
Ā, me pēhea te takawaenga? I ngā wā katoa, ka taea e ngā rōpū te whakaae ki te takawaenga (ki te whiriwhiri rānei) i tā rātou tautohe. I roto i te whakatau tautohe i raro i ngā Ture Whakatau Tautohe a te Taraipiunara Whakahē Hanga Whare (kōwhiringa 1 i raro nei), ka whakaroahia te tukanga whakatau tautohe ina hiahia ngā rōpū ki te tuku i te tautohe ki te takawaenga i muri i te tīmatanga o te whakatau tautohe.
Ko ngā kōwhiringa e rua mō te whakatau tautohe ko:
1. Te Whakataunga i raro i ngā Ture a te Taraipiunara Taupatupatu Hanga Whare – mā tēnei tauira whakatau ka tātarihia aunoatia tetahi tautohe ki roto i te tukanga whakataunga tino ōrite i runga i te uara o te tautohe (ka taea e ngā rōpū te whakaae i tētahi atu tukanga, engari ko te kōwhiringa taunoa te kōwhiringa tino ōrite i runga i te wā me te utu):
Te uara o te tautohe | Ngā Ture Taunoa | Ngā Āhuatanga Matua |
|---|---|---|
$2.5M, neke atu rānei | Ngā Ture Whakatau Paerewa | Me whakaae ngā rōpū ki te wātaka, me whakatau rānei e te taraipiunara whakatau Te whakarongo, ki te kore ngā rōpū e whakaae ki tētahi atu mea |
$1M tae atu ki te $2.5M | Ngā Ture Whakatau Tautohenga ECA90 | 90 ngā rā mahi ki te whakawhiwhinga 5 ngā rā mahi mō te whakarongo, ki te kore ngā rōpū e whakaae ki tētahi atu mea |
$250K tae atu ki te $1M | Ngā Ture Whakatau Tautohenga ECA60 | 60 ngā rā mahi ki te whakawhiwhinga 3 ngā rā mahi mō te whakarongo, ki te kore ngā rōpū e whakaae ki tētahi atu mea |
Tae atu ki te $250k, he whakamāmātanga whakapuakitanga rānei | Ngā Ture Whakatau Tautohenga ECA45* |
Mō ngā tuhinga anake (kāore he whakawakanga) He ratonga utu pumau e wātea ana 45 ngā rā mahi ki te whiwhi tohu |
* e pā ana ngā tikanga me ngā herenga
2. Whakataunga ā-tau motuhake – mā tēnei tauira whakatau ka taea e koe te uru atu ki te whakahaere take me te tirotiro me te tautoko whakahaere a te Taraipiunara Tautohe Hanga Whare.
Mā tētahi o ngā kōwhiringa e rua ka whakaaetia te whakatūnga o te taraipiunara whakatau tautohe e ngā rōpū. Heoi, ki te kore he whakaaetanga (he mea e tupu pinepine ana), mā tētahi o ngā tauira whakatau tataunga e whakarite kia whai tikanga whai hua ngā rōpū mō te whakatūnga tere me te whai hua o te taraipiunara whakatau tautohe, kia taea ai te haere tonu o te whakatau tautohe me te kore e whakaroa.
Tauira Wāhanga mō te Whakataunga i raro i ngā Ture Whakataunga BDT
Me whakauru te rarangi e whai ake nei ki roto i ngā kirimana ina hiahia ngā rōpū kia whakatauhia ngā tautohe a meake nei mā te whakatau tautohe i raro i ngā Ture Whakatau Tautohe a te Taraipiunara Tautohe Hanga Whare:
"Ko ngā tautohe, ngā rerekētanga rānei e puta mai ana i tēnei kirimana, e pā ana rānei ki tēnei kirimana, ki te kaupapa rānei o tēnei kirimana, tae atu ki tētahi pātai mō tōna oranga, tōna mana, tōna whakamutunga rānei, me tuku atu ki te whakatau ā-tau, ā, me whakatau whakamutunga mā te whakatau ā-tau i runga anō i ngā Ture Whakatau ā-Tau o te Taraipiunara Tautohe Hanga Whare."
Kia mōhio: ko ngā rōpū o tētahi tautohe o nāianei kāore anō kia whakauru i te Wāhanga Tauira Whakatau Tautohe a te Taraipiunara Tautohe Hanga Whare ki roto i tētahi whakaaetanga o mua, ka whakaae tonu rātou ki te tuku i taua tautohe ki te whakatau tautohe i raro i ngā Ture Whakatau Tautohe a te Taraipiunara Tautohe Hanga Whare mā te haina i te Whakaaetanga Whakatau Tautohe i te puka kei te Tāpiritanga 2 o aua Ture .
Tauira Wāhanga mō te Whakataunga Tautohenga i raro i te Ture Whakataunga Tautohenga 1996
Me whakauru te rarangi whakatau tautohe e whai ake nei ki roto i ngā kirimana ina hiahia ngā rōpū kia whakatauhia ngā tautohe a meake nei mā te whakatau tautohe i raro i te Ture Whakatau Tautohe 1996:
"Ko ngā tautohe, ngā rerekētanga rānei e puta mai ana i tēnei kirimana, e pā ana rānei ki tēnei kirimana, te kaupapa rānei o tēnei kirimana, tae atu ki tētahi pātai mō tōna oranga, tōna mana, tōna whakamutunga rānei, me tuku atu ki te whakatau ā-tau, ā, me whakatau whakamutunga mā te whakatau ā-tau i runga anō i te Ture Whakatau Ā-tau 1996. Me whakatū te taraipiunara whakatau ā-tau mai i te rōpū whakatau ā-tau e puritia ana e te Taraipiunara Tautohe Hanga Whare, ā, ki te kore e taea e ngā rōpū te whakaae ki te hanganga o te taraipiunara whakatau ā-tau i roto i ngā rā e whitu o te panuitanga tuhituhi mō te tukunga o te tautohe, me whakatū te taraipiunara whakatau ā-tau e te Taraipiunara Tautohe Hanga Whare i runga i te tono a tētahi rōpū ki tēnei whakaaetanga."
1. Kotahi te tokomaha o ngā kaiwhakawa [ka taea rānei te whiriwhiri i te tokotoru].
2. Ko te reo hei whakamahi i roto i te Whakataunga ko te reo Pākehā [whiriwhiria rānei tētahi atu reo].
3. Ko te ture whakahaere o te kirimana ko te ture matua o Aotearoa [me whiriwhiri rānei i tētahi atu whenua].
Kia mōhio: ka whakaae pea ngā rōpū o tētahi tautohe o nāianei kāore anō kia whakauru i tēnei Wāhanga Tauira a te Taraipiunara Tautohe Hanga Whare ki roto i tētahi whakaaetanga o mua ki te tuku i taua tautohe ki te whakatau tautohe i raro i te Ture Whakatau Tautohe mā te haina i tētahi o ngā Whakaaetanga Whakatau Tautohe e wātea ana i te whārangi Aratohu me ngā Rauemi Whakatau Tautohe .
He tautohe kē tāu?
Ka taea tonu e ngā rōpū o tētahi tautohe o nāianei kāore anō kia whakaurua te Wāhanga Whakatau Tauira BDT ki roto i tētahi whakaaetanga o mua te whakaae ki te tuku i taua tautohe ki te whakatau tautohe i raro i ngā Ture Whakatau Tauira BDT mā te hainatanga i tētahi whakaaetanga hei tuku i tā rātou tautohe ki te whakatau tautohe.