He Aratohu ki te Whakatinana i raro i te Ture Kirimana Hanga 2002

He maha ngā huarahi e taea ai e tētahi rōpū te whakamana i tētahi whakataunga whakatau i raro i te Construction Contracts Act 2002 (te Ture ).

Ka taea hoki te whakahē i te whakataunga a te kaiwhakawā (i ētahi wā) mā te arotake ā-ture i roto i te Kōti Matua.

Ko te kaupapa o tēnei Aratohu he whakarato i tētahi whakarāpopototanga o ngā huarahi hei whakamana i tētahi whakataunga i raro i te Ture Kirimana Hanga, ā, me pānui tahi me te Aratohu a te Taraipiunara Taupatupatu Hanga ki te Ātete i te Whakamana i raro i te Ture Kirimana Hanga 2002.

Ngā mihi nui ki ngā kaituhi o te Aratohu: a Russell McVeagh rāua ko Haggie Law

Tikiake aratohu

Tikiake i tētahi kape o tā mātou Aratohu ki te Whakatinana i raro i te Ture Kirimana Hanga 2002