Ngā Ture Kirimana Hanga 2003

I raro i te wāhanga 82 o te Construction Contracts Act 2002, i whakatinanahia ngā Ture Kirimana Hanga 2003, ā, i whai mana i te 1 o Paenga-whāwhā 2003.

Kei roto i ngā Ture ngā puka e hiahiatia ana, me ētahi atu mea, mō ngā mōhiohio e tika ana kia:

  • me tāpiri atu ngā kereme utu (Puka 1); me
  • me whakatakoto i roto i tētahi pānui whakatau (Puka 2).
Kei roto hoki i ngā Ture ētahi atu momo ratonga i raro i te Ture 9.