Kua pānuihia e au, ā, kua mārama ahau kei raro ahau i ngā Ture 7.2 – 7.6 o ngā Ture Whakatautau BDT. E mārama ana ahau mā te whai wāhi atu, te mōhio rānei ki ngā Whakatautau BDT, kei raro ahau i ēnei Ture.
E mārama ana ahau kāore au e whakaae kia whakaaturia ngā mōhiohio katoa i whiwhihia e pā ana ki te Whakataunga, tae atu ki te mea e pā ana ki te Whakataunga, engari i raro i ngā Ture 7.4 – 7.6.
E mārama ana ahau he kawenga huna tāku ki ngā Rōpū katoa, ki te BDT, ki te Kaitakawaenga, me ērā atu rōpū kāore i te whai wāhi ki te Takawaenga, ā, ki te kore e tutuki i ahau tēnei kawenga, ka pāngia pea ahau e ngā hua ture.
E mārama ana ahau mēnā kei te hiahia ahau ki te whakapuaki i tētahi Mōhiohio Matatapu, me whakamōhio atu ahau ki ngā tāngata katoa kua whakarārangihia i roto i te Ture 7.5.