- John Sisk & Son v Duro Felguro UK Ltd [2016] EWHC 81 (TCC)
- Te Whakarāpopototanga o te Take: New Zealand Fire Sprinkler Protection Ltd v AFS Total Fire Protection Ltd [2016] NZHC 690
- Te aro atu ki te riri: te hiranga o te riri i roto i ngā kirimana hanga o ēnei rā
- Ngā Rongoā Whakawā mō ngā Hapa Hanga: Ture Whānui, Tika, Ture rānei?
- Ko te kōrero pono tonu te kaupapa here pai rawa atu: Laing O'Rourke Australia Construction Pty Ltd v Samsung C&T Corporation , Maehe 2016
- Kia tūpato – ka taea te whakarerekē i tētahi kirimana mā te kōrero ā-waha, mā te whanonga rānei ahakoa he rerekē te mea kei roto i te kirimana!
- He Whakarāpopototanga o te Take: Ko Jardbonir HF e hokohoko ana hei Iceland Drilling v Summit Hydraulic Solutions Ltd [2016] NZHC 490
- Kei a koe te wā: he aha te pānga ki te rā otinga mēnā ko ngā mahi a te tumuaki me te kaiwhakatū te take o te whakaroa?
- Kei hea atu i konei: me aha ina pau te wātaka utu wā poto