TERMS AND CONDITIONS
1.0 INTRODUCTION
1.1 These terms and conditions govern the services provided by the Building Disputes Tribunal (BDT) and set out the terms of our agreement with you (agreement).
1.2 BDT provides independent, specialist, domestic and international dispute resolution services for the building and construction industry.
1.3 The Minister of Building and Housing has approved BDT as an Authorised Nominating Authority to nominate adjudicators under the Construction Contracts Act 2002.
1.4 Before using BDT’s services, it is important that you understand these terms and conditions.
2.0 TERMS AND CONDITIONS
2.1 By accessing BDT’s website you:
(a) are deemed to have read, understood and accepted these terms and conditions, and you agree to be bound by them;
(b) warrant that you are authorised to use the BDT services by any person, company, entity or organisation that you purport to represent, and that all information you have provided to BDT is, and except to the extent updated in writing by you, remains in every respect true, correct, and complete; and
(c) accept that these terms and conditions may be amended or modified by BDT at any time in whole or in part. Except as provided in clause 21.7, amendments and modifications are effective immediately upon publication on the website. You are responsible for ensuring you are familiar with the latest terms and conditions.
3.0 DEFINITIONS AND INTERPRETATION
3.1 Unless the context otherwise requires, the following words and expressions have the following meanings:
Act or CCA means the Construction Contracts Act 2002.
adjudication means adjudication under the Act.
adjudicator means an individual who is appointed by BDT to determine a dispute that has been referred to adjudication under the Act .
administration fee means a non-refundable fee for administering the dispute resolution service which must be paid by the parties prior to the service commencing and which is calculated on the basis set out on the website by reference to the amount in dispute.
application means any written or electronic application made by any person to BDT for the appointment of a dispute resolution professional.
arbitration means arbitration under the Arbitration Act 1996 and its amendments and, where applicable, the BDT rules for arbitration.
arbitrator means any individual who is appointed by BDT, or by the parties directly, to determine a dispute that has been referred to arbitration.
authorised nominating authority has the meaning ascribed to it in the Act and includes BDT.
bank account means BDT trust account.
Building Disputes Tribunal (the Tribunal/BDT) means Building Disputes Tribunal (NZ) Limited, a company incorporated under the Companies Act 1993 (company number 802252).
BuildLaw® means the publication of BDT.
cancellation fee means a fee charged by BDT when a claim, dispute or any other subject matter of a dispute resolution service is terminated, withdrawn or otherwise resolved between the parties after receipt of an application to nominate or appoint a dispute resolution professional and before that person fully performs the service.
dispute resolution service means any of the dispute resolution services provided or administered by BDT.
dispute resolution professional means any person authorised by BDT to provide dispute resolution services under any agreements, rules, and protocols promulgated by BDT.
early neutral evaluation means a confidential, settlement-oriented dispute resolution service that produces a non-binding evaluation of the facts, evidence and legal merits of a case by an independent, neutral third party unless the parties agree that the evaluation is to be binding.
expenses means the actual disbursements for the service including travel, accommodation, meals, taxis, couriers, personal vehicle mileage charges, communication, secretarial and administration services, hireage of hearing or meeting rooms, court reporting services, transcription services, interpreters, expert or legal advice, and any other reasonable costs relating to the conduct of the service.
expert determination means a consensual process by which parties to a contract agree to refer matters in dispute to an independent person to decide as an expert and not as an arbitrator.
fees means any amount due and payable by the parties to BDT for any dispute resolution service provided by BDT and includes the fees and expenses of any dispute resolution professional and any administration fees or cancellation fees due and payable under these terms and conditions, other terms and conditions on the website, or generally.
fees and expenses schedule means any Schedule of Fees and Expenses forming part of any dispute resolution service agreement, rules, or protocol published on the website.
fixed fee low-value claim adjudication service (LVC) means the service provided by BDT for adjudication claims of limited complexity for amounts in dispute less than the threshold and that comply with the specific conditions published on the website at the time of application.
fixed fee low-value arbitration claim service (LVAC) means the service provided by BDT for arbitration claims of limited complexity for amounts in dispute less than the threshold and that comply with the specific conditions published on the website at the time of application.
force majeure event means any act or event beyond the reasonable control of BDT including pandemic, any industrial disputes, strikes, go-slow, failures of any utility service or provider, act of God, war, riot, civil commotion, compliance with law, change in law, breakdown of plant or machinery, fire, explosion, flood, storm, earthquake, default of any supplier or subcontractor acting independently of BDT, inability to access premises due to a local, regional or national state of emergency or other mandatory restriction, terrorism or insurrection, and any event or act similar or analogous to any of the above acts or events.
general claim means any adjudication or arbitration claim that is not an LVC or LVAC (and is therefore not eligible for a fixed fee).
mediation means a confidential, consensual and informal negotiation process where parties use a dispute resolution professional to assist them to resolve their dispute.
panels means the lists of dispute resolution professionals published on the website.
parties means the parties to any dispute resolution service, their agents and employees, executors, administrators, successors and any other permitted assigns.
rules for arbitration means the rules for arbitration published on the website from time to time, which currently include: the BDT’s Standard Arbitration Rules, the BDT ECA45 Arbitration Rules, the BDT ECA60 Arbitration Rules and the BDT ECA90 Arbitration Rules.
security means the amount of money required to be paid in clear funds to the BDT trust account as security for the Fees and Expenses of the dispute resolution professional.
service(s) means any one or more services offered by BDT from time to time including its nomination and appointment service, low-value adjudication claim service, general claim adjudication service, low-value arbitration claim service, expedited commercial arbitration, administered domestic commercial arbitration, expert determination, mediation, early neutral evaluation, BuildLaw, newsletters, training opportunities, seminars, webinars, website, and any other supply or service of whatsoever nature that BDT may offer.
user means any person, company, entity or organisation, who accesses the website, or arranges for someone to access the website, whether they access, use, or otherwise refer to or rely on any of the services provided.
website means the website for BDT at buildingdisputestribunal.co.nz.
3.2 Unless the context otherwise requires, in these terms and conditions:
(a) words in the singular shall include the plural and vice versa; words importing a gender include every gender.
(b) references to persons include corporations, partnerships, government and local authorities and agencies, and any unincorporated associations or bodies of persons.
(c) references to “include” or “including” are to be construed without limitation.
(d) a reference to “we”, “our” or “us” means BDT.
(e) a reference to “he”, “she”, “it”, “you”, “your” or “yourself” means the user.
(f) a reference to a Party includes its employees, agents, executors, administrators, successors and permitted assigns.
3.3 To the extent that these terms and conditions are inconsistent with any other terms and conditions published on the website, these terms and conditions will take precedence over and replace any such inconsistent terms and conditions.
4.0 GENERAL PROVISIONS
4.1 All users accept and acknowledge that:
(a) you view, access, and use the website and the services provided by BDT in good faith, at your own risk, and solely in reliance on your own investigations, enquiries and judgment.
(b) we are not an agent, employee, servant or associated entity of any user, and we are not liable for any act or omission, misconduct, fraud, misrepresentation or any other thing done or omitted to be done by any other user of the service; and
(c) the services on the website (and generally) are provided on an “as is” and “as available” basis. We do not guarantee or warrant that access to the website will be error-free or uninterrupted, of that the information will be complete, accurate and current.
4.2 When using BDT’s website and services you must observe and comply with all relevant New Zealand laws, including all applicable statutes and regulations, and with these terms and conditions.
5.0 USER OBLIGATIONS
5.1 As a user of the website and services provided by BDT, you:
(a) agree to use the website and the services in a proper, appropriate, professional, and lawful manner;
(b) acknowledge that BDT does not independently verify the information provided by any dispute resolution professional or other person providing information or materials to be published on the website. Accordingly, BDT does not warrant that the information provided by any dispute resolution professional or other person published on the website is complete, accurate and current;
(c) agree that BDT, its agents and employees cannot and do not provide legal advice concerning any claim, dispute, question, concern, issue or any other matter raised by any user and, if you use any information provided on the website or otherwise by BDT, its agents or employees, you do so entirely in reliance on your own judgment, having taken independent legal advice and having made your own enquiries and not in reliance on any statements or representations made by or on behalf of BDT, its agents or employees;
(d) agree that by accessing, using or relying on any information provided by BDT in any form or manner for any purpose whatsoever including any subsequent dispute resolution service, you expressly acknowledge and agree that you do so exclusively in reliance on your own skill and judgment and not in reliance on any understandings, statements, agreements, representations or warranties made by or on behalf of BDT, its agents or employees;
(e) acknowledge that BDT does not accept any responsibility or liability howsoever arising from, or relating to, any acts or omissions of any member of its panels, whether in relation to the qualifications, the advice, the outcome of any dispute, or any other matter without limitation;
(f) agree to receive emails from BDT relating to the services or items of interest. You may unsubscribe from these emails at any time. However, you take sole responsibility for any correspondence missed because of unsubscribing. If you are a party in an ongoing matter, you must provide an alternative address for service and means of contact;
(g) agree to indemnify BDT from and against all actions, claims, costs (including legal costs and expenses), losses, proceedings, damages, liabilities or demands suffered or incurred by BDT to any person arising out of or in connection with your failure to comply with these terms and conditions; and
(h) acknowledge that BDT, its agents and employees do not accept any responsibility for any user dissatisfaction with any service provided, whether in relation to stated or assumed qualifications, skills, expertise, experience, performance or non-performance of services, fees charged, outcome or result, or otherwise.
6.0 OUR OBLIGATIONS
6.1 In providing the services, BDT will:
(a) maintain and manage the website;
(b) administer and manage the services;
(c) ensure that the most up to date terms and conditions are available on the website for review at any time; and
(d) give and consent to being given any notice, communication or document required to be served under these terms and conditions by email.
6.2 In performing the services, BDT will rely upon the information and documents provided, or purported to be provided, by or on behalf of any user and shall be under no duty to investigate or validate the authenticity, completeness or accuracy of any such information or documents.
6.3 BDT will make reasonable efforts to ensure that the material and information published on the website is correct. However, BDT does not warrant or represent that the website will be free from error or operate without delay from time to time or that the information published on the website will not contain errors or misstatements.
7.0 USING THE SERVICES
7.1 In applying to use any of the services provided by BDT, you understand and agree that:
Accuracy and completeness of information
(a) By applying to use any service, you warrant that you are authorised to make an application for, or on behalf of the claimant, and that all information provided in relation to that application is to the best of your knowledge, correct, complete and accurate in all respects.
(b) When making an application to BDT for any dispute resolution service, you have provided all information required to enable BDT to make such nomination or appointment of a dispute resolution professional as may be required in sole reliance on the information and documents provided by you in support of the application.
(c) The Building Disputes Tribunal does not undertake any independent investigations, assessment or verifications of any such documents or information provided for the above purpose.
Payment of fees
(d) The parties are jointly and severally liable to pay the dispute resolution professional’s fee, including any fees and expenses incurred by the dispute resolution professional if a claim is withdrawn or terminated, or the dispute between the parties is resolved before an award, determination, evaluation or decision is made, together with any additional costs incurred by BDT in recovering any overdue monies, on a full indemnity basis.
(e) As you are jointly and severally liable to pay the fees and expenses incurred by any dispute resolution professional in carrying out the dispute resolution service, you undertake and agree to pay any fees in full and without deduction if other party defaults or fails to pay any proportion of the fees, together with any additional costs incurred in the recovery and collection of those fees by BDT or the dispute resolution professional, on a full indemnity basis.
(f) Any money paid as security for the dispute resolution professional’s fees and expenses is a nominal amount only and is not, and shall not be considered to be, an estimate of the cost of the service except where the security is paid for as the fixed fee for a fixed fee service under the the applicable terms and conditions and fees published on the website at the time the application is made.
(g) The total cost of any dispute resolution service, other than a fixed fee service, shall be calculated according to the time spent on that process by the dispute resolution professional, charged at their usual hourly or daily rate together with any costs and expenses incurred and, where relevant, BDT’s administration fee and any cancellation fee.
(h) If the amount held as security is less than the total fees, including costs and expenses, of the dispute resolution professional, BDT shall withhold the release of any determination, award, evaluation, decision, or other product of the dispute resolution professional’s service until such time as the fees are paid in full.
(i) If the amount held by way of security is more than the total fees of the dispute resolution professional, BDT will provide any determination, award, evaluation or decision to the parties as soon as practical after the dispute resolution professional has made such determination, award, evaluation or decision and shall disburse the balance of the monies held as security to the parties in such proportions as determined by the dispute resolution professional or, if the dispute resolution professional does not determine the matter, in the proportions that the parties agreed to pay the security, or in the event that no such agreement was made, in such proportions that would result in equal payment by each party as far as possible.
(j) Where a dispute or matter is withdrawn, cancelled or resolved after the receipt by BDT of any application to nominate or appoint a dispute resolution professional, BDT will charge a cancellation fee in the published on the website for the service at the time the application for the service is made, or if no cancellation fee is published, a reasonable fee for the time spent on administering the service.
(k) To the extent permitted by law, the parties together and separately release and discharge the dispute resolution professional and BDT, its agents and employees from all liability of any kind (whether involving negligence, breach of contract, breach of fiduciary duty, breach of statutory duty or otherwise) which may be alleged to arise in connection with, or to result from, or to in any way relate to the exercise of any of the functions, duties, or powers of the dispute resolution professional or BDT unless such act or omission is fraudulent.
(l) The parties together and separately agree to indemnify and keep indemnified the dispute resolution professional, BDT, its agents, and employees, against all claims, costs, expenses, liabilities, awards, damages and proceedings of any kind whatsoever incurred by the dispute resolution professional, BDT, its agents, or its employees, in the exercise of any of the functions, duties or powers of the dispute resolution professional or BDT unless the act or omission is fraudulent.
(m) For a general claim, the parties may be required to pay a further amount or amounts from time to time as security for the dispute resolution professional’s fees, including costs and expenses. For example, where the dispute resolution professional estimates that their incurred fees have reached 80% of the amount held as security by BDT, the dispute resolution professional may require that a further amount (determined by the dispute resolution professional at their sole discretion) be paid as security into the bank account within any period of time they determine. The dispute resolution professional may suspend the matter until the further security is paid.
8.0 SPECIAL PROVISIONS FOR ADJUDICATION
8.1 BDT will not serve, as agent for the nominated adjudicator, any Notice of Acceptance under the Act until security for the adjudicator’s fees for any general claim or the entire fee required for a LVC are paid in clear funds to the bank account.
8.2 You acknowledge and accept that there are special conditions in respect of the LVC service including a limit of three issues in dispute that may be determined in any one adjudication proceeding and a limit on the number and extent of documents that may be submitted by a claimant in support of any claim as set out on the website at the time the application is made.
8.3 The LVC service fixed fee does not include any allowance for a conference or inspection of the construction work or any other thing to which the dispute relates.
8.4 If any party, or the adjudicator, requires a conference to be convened or an inspection to be undertaken, BDT will charge the parties such further amount as is published on the website at the time the application for the service is made together with any mileage and travel expenses incurred by the adjudicator for the conference and/or inspection. This additional amount must be paid to BDT before the adjudicator’s determination will be given to the parties.
8.5 If an LVC presents undue complexity despite the low value of the claim or the limited number of matters at issue, or the submissions and evidence submitted in support of the claim exceed the permitted number of documents, BDT may at its sole discretion decline to provide the adjudication on a fixed fee basis under the LVC service. Such a decision is of an administrative nature and shall be final and binding on the parties and is not subject to appeal. Neither BDT nor the Adjudicator shall be required to state or communicate reasons for the decision.
8.6 In that event, BDT shall advise the parties and the claim will revert to a general claim. The cost of the adjudication will be determined according to the time engaged by the adjudicator on the duties of the matter together with any costs and expenses incurred by the adjudicator in the execution of those duties. The adjudicator may require the parties to pay a further amount or amounts as security under clause 7.1(m).
9.0 SPECIAL PROVISIONS FOR ARBITRATION
9.1 You acknowledge that any arbitration is to be conducted in accordance with the relevant BDT rules for arbitration and the Arbitration Act 1996.
9.2 You acknowledge and accept that there are special conditions in respect of the LVAC including a limit of three issues in dispute that may be determined in any one arbitration proceeding and a limit on the number and extent of documents that may be submitted by a claimant in support of any claim, as set out on the website at the time the application is made.
9.3 The LVAC fixed fee does not include any allowance for a conference or inspection of the construction work or any other thing to which the dispute relates.
9.4 If any party, or the arbitrator, requires a conference to be convened or an inspection to be undertaken, BDT will charge the parties such further amount as is published on the website at the time the application for the service is made together with any mileage and travel expenses incurred by the arbitrator for the conference and/or inspection. This additional amount must be paid to BDT before the arbitrator’s award will be given to the parties.
9.5 If a Fixed Fee Low Value arbitration Claim presents undue complexity despite the low value of the claim or the limited number of matters at issue, or the submissions and evidence submitted in support of the claim exceed the permitted number of documents, BDT may at its sole discretion decline to provide the arbitration on a fixed fee basis under the LVAC service. Such a decision is of an administrative nature and shall be final and binding on the parties and is not subject to appeal. Neither BDT, nor the arbitrator shall be required to state or communicate reasons for the decision.
9.6 In that event, BDT shall advise the parties and the claim will revert to a general claim. The cost of the arbitration will be determined according to the time engaged by the arbitrator on the duties of the matter together with any costs and expenses incurred by the arbitrator in the execution of those duties. The arbitrator may require the parties to pay a further amount or amounts as security under clause 7.1(m). The dispute resolution professional may suspend the matter until the further security is paid.
10.0 SPECIAL PROVISIONS FOR EARLY NEUTRAL EVALUATION
10.1 You acknowledge that any early neutral evaluation will be conducted under these terms and conditions, BDT Agreement and Rules for Early Neutral Evaluation and BDT Protocol for Early Neutral Evaluation published on the website at the time the application for early neutral evaluation is made.
11.0 SPECIAL PROVISIONS FOR EXPERT DETERMINATION
11.1 You acknowledge that any expert determination will be conducted in accordance with these terms and conditions and BDT Agreement and Rules for Expert Determination published on the website at the time the application for expert determination is made.
12.0 SPECIAL PROVISIONS FOR MEDIATION
12.1 You acknowledge that any mediation will be conducted in accordance with these terms and conditions, BDT Agreement to Mediate and BDT Protocol for Mediation published on the website at the time the application for mediation is made.
13.0 TERMINATION
13.1 At any time, we may without notice, remove, amend or vary any part of the website or the services, or cease to operate the website or the services in whole or in part.
13.2 We shall not be obliged or required to consult with any users of the website prior to making any such removal, amendment, variation or cessation referred to above.
14.0 PERSONAL INFORMATION AND PRIVACY
14.1 BDT collects personally identifiable information about customers and users of the Services through our Website (www.buildingdisputestribunal.co.nz) and in offline transactions such as over the telephone and through correspondence and discussions. We may use cookies or local shared objects on our website or emails. Personal information includes, but is not limited to, name, address and other contact details and usage patterns and preferences.
14.2 Subject to the terms of the Privacy Act 2020, you authorise us to:
(a) retain and record any personal information provided in connection with BDT;
(b) collect, store, use and disclose information about you for any purpose relating to the services, including but not limited to:
(i) verification of your identity;
(ii) enforcement of these terms and conditions;
(iii) marketing;
(iv) presenting offers from us or third parties that might be of interest to you;
(v) research;
(vi) compliance with all applicable laws and regulations;
(vii) performing the services provided by BDT generally; and
(viii) any other use that you authorise.
14.3 We may share your personal information with third party data processing organisations or government agencies for any of the purposes described here. Where possible we will require these third parties to comply with our instructions strictly and not use the information for any other purpose. We will not disclose your personal information to any other third party without your consent. You may contact BDT to enquire whether information has been provided to government agencies or third-party data processing organisations.
14.4 Failure to provide personal information requested at the time of submitting an application to use any dispute resolution service may result in certain services not being offered and/or provided to you.
14.5 Under the Privacy Act 2020 you have the right to access your personal information recorded by us and have it updated or corrected. If you have any questions about the privacy and security of your personal information, please contact us on + 64 9 486 7143, or by email at registrar@buildingdisputestribunal.co.nz.
14.6 BDT undertakes to use security protocols to ensure data which users of the services provide is appropriately encrypted and held in confidence. However, no data transmission over the Internet can be guaranteed to be completely secure, we cannot ensure or warrant the security of any information you transmit or receive through the use of our services, and all such activities are conducted at your own risk.
15.0 INTERNET AND ELECTRONIC INFORMATION SECURITY
15.1 We undertake to use security protocols to ensure that data provided to us electronically, for any purpose, is appropriately encrypted and is held in confidence.
15.2 You must not do anything to damage, interfere with or harm the website or services, or any network, or any system underlying or connected to them, or attempt to do so.
15.3 You may not use a robot, spider, scraper or other automated means to access the website or information featured on it for any purpose whatsoever.
16.0 COPYRIGHT
16.1 Unless otherwise indicated, all proprietary and intellectual property rights in this website, including, but not limited to, all material, content, logos, design, selection and arrangement of elements, organisation, compilation, graphics, text, invented words, audio recordings, video recordings, icons, images, and software underlying and forming part of the services offered by BDT and the website, together with all other matters related to the website, are the exclusive property of BDT, or the material is included with permission of the rights owner and all such property is protected by New Zealand and international copyright and trademark laws.
16.2 The posting of any such elements on this website does not constitute a waiver of any right in such element. You do not acquire ownership rights to any such elements viewed through this website.
16.3 Except as otherwise provided herein, no property of BDT, its licensors or its suppliers may be used, copied, reproduced, adapted, distributed, republished, downloaded, modified, displayed, posted, stored in a retrieval system, printed or transmitted in any form or by any means, including but not limited to electronic, mechanical, photocopying or otherwise, on-sold, commercialised or used to create derivative works without BDT’s express and prior written permission.
16.4 Permission is hereby granted to the extent necessary, to lawfully access and use this website and the information, materials, services and products available on it and to display, download, archive, copy and print portions of this website for personal use only, provided you do not modify the materials. This permission terminates automatically if you breach any of the terms and conditions of use of the website or BDT services. If such permission is terminated, you must immediately destroy any and all downloaded, printed, archived or otherwise maintained and/or stored materials obtained from your use of the website. All rights, including translation, are reserved.
Building Disputes Tribunal 2025©
17.0 TRADEMARKS
17.1 Unless otherwise indicated, BDT logo and all service names, page headers, custom graphics, button icons, trademarks, service marks, and logos appearing on this website are service marks, trademarks, and/or trade dress of BDT (the marks).
17.2 All other trademarks, product names, company names, logos, service marks, and/or trade dress mentioned, displayed, cited or otherwise indicated on this website are the property of their respective owners. You agree not to display or use the marks in any manner without our prior written permission. You agree not to display or use trademarks, product names, company names, logos, service marks and/or trade dress of other owners without the prior written permission of those owners. The use or misuse of the marks or other trademarks, product names, company names, logos, service marks and/or trade dress, or any other material contained herein (except as permitted on the website) is expressly prohibited.
18.0 DISCLAIMERS, INDEMNITIES AND LIMITS OF LIABILITY
18.1 All users acknowledge and agree that, for the purpose of delivering the services, BDT:
(a) relies entirely on the information, documents, and/or other material provided, or purported to have been provided, by or on behalf of any user or dispute resolution professional;
(b) is not under any duty to investigate or validate the authenticity, completeness and/or accuracy of any such information, documents, and/or material; and
(c) may change, delete, add to or otherwise amend the information on the website without notice and it is the responsibility of the parties using the information to ensure that they have the most recent and up to date information available.
18.2 BDT expressly does not represent or warrant that:
(a) the website will be free of error, or operate without delay or interruption from time to time; and/or
(b) information contained on the website will not contain errors or misstatements.
18.3 BDT, its agents and employees expressly do not accept any responsibility for any user dissatisfaction with any service or dispute resolution professional, or generally, whether in relation to stated or assumed qualifications, skills, expertise, experience, performance or non-performance of services, Fees charged, the outcome or result of any dispute, or otherwise without limitation.
18.4 BDT, its agents and employees do not assume any liability to anyone for any loss or damage caused directly or indirectly by any error, omission, or misstatement made in, or in connection with, the website or its serviceservices generally, and to the full extent permitted by the law, expressly disclaim any and all such liability whether involving tort, breach of contract, breach of fiduciary duty or breach of statutory duty or otherwise and all such liability is expressly disclaimed.
18.5 BDT gives no undertakings, representations, or guarantees in relation to any information published on the website including, but not limited to, the accuracy or truth of any information published.
18.6 Your use of the website is at your sole risk. By accessing, using, or relying upon any information or material published on the website for any purpose whatsoever, you expressly acknowledge and agree that you do so exclusively in reliance on your own skill and judgment and not in reliance on any understandings, statements, agreements, representations or warranties made by or on behalf of BDT, its agents, or employees.
18.7 All users release and discharge BDT, its agents, and employees, from all liability of any kind (whether involving negligence, breach of contract, breach of fiduciary duty, breach of statutory duty, or otherwise), which may be alleged to arise in connection with, or to result from, or to in any way relate to the services or BDT’s duties, or powers whether done or omitted to be done under the services, in connection with the website, or otherwise, unless the act or omission is fraudulent.
18.8 All users indemnify and keep indemnified BDT, its agents, and employees, against all claims, costs, expenses, liabilities, awards, damages and proceedings of any kind incurred by BDT, its agents, and employees, in the exercise of their functions, duties, or powers whether in relation to the provision of any services, these terms and conditions, the website, or otherwise, unless the act or omission is fraudulent.
19.0 HYPERLINK DISCLAIMER
19.1 The website may include hyperlinks to other websites maintained by us or affiliated companies, as well as hyperlinks to websites owned and operated by companies and/or other persons unrelated to BDT.
19.2 Any hyperlink to an unrelated website does not in any way mean that BDT approves of, endorses, supports, or accepts any responsibility for that website, its content and/or systems, or the goods and/or services provided or advertised through that website.
19.3 BDT, its agents and employees do not assume any liability to anyone for any loss or damage caused directly or indirectly by any error, omission, or misstatement made in, or in connection with, the information and materials published on any unrelated websites, and to the full extent permitted by the law, expressly disclaim any and all such liability whether involving tort, breach of contract, breach of fiduciary duty, or breach of statutory duty or otherwise, and all such liability is expressly disclaimed.
19.4 Any unrelated websites are not monitored or checked by BDT to determine their accuracy, legitimacy, or conformance with any applicable laws, standards and regulations. Accordingly, the use of any hyperlinks published, and any consequential use of any unrelated websites linked in this manner to BDT website, is entirely at your sole risk. All rules, policies and operating procedures of any unrelated websites will apply to you while you are using those websites.
20.0 DISPUTES
20.1 You agree not to involve, or attempt to involve, BDT, its agents, or employees in any dispute or in any process for the resolution of any dispute that may arise, between you and any other user or dispute resolution professional, as a result of your use of the website, any service, or otherwise.
20.2 If you intend to initiate civil proceedings against any user or dispute resolution professional, and you require any contact details for that user or dispute resolution professional for the purpose of such proceedings, BDT will provide those details to you only upon receipt of a properly sworn or affirmed statutory declaration stating that you require that information for that specific and sole purpose.
21.0 MISCELLANEOUS
21.1 Service of Notices: You shall give (and hereby consent to be given) all notices, communications and documents required to be served under these terms and conditions or any service, Act or Regulation by email to the email address that you notify to us in writing (including by email) for this purpose from time to time.
21.2 Governing Law: These terms and conditions shall be governed and construed under the laws of New Zealand and each user agrees to submit to the non-exclusive jurisdiction of the New Zealand Courts.
21.3 Entire Agreement: These terms and conditions constitute the entire agreement between BDT and a user, and supersede any advice, communications, representations, or agreements whether previously provided or published on the website or not.
21.4 Waiver: Any failure to enforce any right or provision of these terms and conditions will not constitute a waiver of such right or provision unless specifically agreed in writing by us.
21.5 Severance: If any provision of these terms and conditions shall be unlawful, void or unenforceable for any reason, then that provision shall be deemed severed from these terms and conditions and shall not affect the existence, validity or enforceability of the remaining terms and conditions which shall not be affected, prejudiced or impaired but shall remain in full force and effect.
21.6 Force Majeure Event: The Building Disputes Tribunal will not be liable for any loss or damage or delay whatsoever incurred by any user as a result of a Force Majeure Event.
21.7 Updates: BDT reserves the right to change, update, amend or modify these terms and conditions in its sole discretion, from time to time without prior notice, but no such change, update, amendment, or modification will have any effect on anything already in operation.
21.8 Assignment: You may not assign your rights under these terms and conditions without the prior written approval of BDT.
21.9 Consumer Guarantees Act 1993: Nothing in these terms and conditions shall affect any rights you may have under the Consumer Guarantees Act 1993 where applicable.