Whakatauhia tō tautohe arotake reti rīhi arumoni i roto i te wā poto me te whai hua hoki 

Engari, he mea noa ngā tautohe arotake reti, inā koa i tēnei āhua ōhanga o nāianei. He maha ngā wā ka taumaha, ka pau te wā, ka nui te utu, ā, ka kino pea te whanaungatanga tonu i waenganui i te rangatira whenua me te kairihi.

He aha ngā kōwhiringa kei a koe mēnā kei roto koe i tētahi tautohe arotake reti? 
Kaituhi(ngā): Favour Lawry

Kei te tuku mātou ināianei i te ratonga arotake reti utu pumau hei āwhina i a koe ki te whakatau i tō tautohe i roto i te tere me te whai hua, me te kore ohorere. Kāore he whakawakanga: ka whakatauhia te whakatau "i runga i ngā tuhinga", ā, ka tukuna he whakatau i roto i ngā rā mahi 25 ki te 35 i muri i te tukunga o te kereme. 

Ko te tikanga o tēnei, he tere ake te whiwhinga whakautu a te rangatira whenua me te kairihi i tērā i roto i te kōti, i tētahi whakawakanga noa rānei. Ka tere tā rāua whakatau i te tautohe, ā, ka neke atu. 

Ko te utu mō tēnei ratonga he $5,000 me te GST, me utu wawe. Ka utua e te rangatira whenua me te kairihi tēnei i roto i ngā hea ōrite mēnā kāore rāua e whakaae ki tētahi atu mea. Kāore he utu whakawhiwhinga: kei te wāhi e tau ai ngā utu, ā, ka tino mārama te utu. 

Ko ētahi atu āhuatanga matua o tā mātou whakataunga arotake reti utu pumau ko: 

  • Ka taea te whakamahi mō ngā arotake mākete, ngā arotake PPI, ngā arotake ōrau pumau, ngā arotake tāra pumau rānei. Ka taea hoki e ia te whakatika i ngā tautohe mō ngā "taupoki" me ngā "kara" me te āhua o te whakamahinga. 
  • Ngā tuhinga kua whakaaetia mō te tuku: 
  • Te tiiti rīhi, te whakaaetanga rīhi rānei; 
  • Ngā rerekētanga e tika ana; 
  • Ngā tuhinga katoa e whakaatu ana i ngā arotake reti o mua e tika ana; me 
  • Ngā pūrongo aromatawai me ētahi atu pūrongo, taunakitanga rānei a ngā tohunga e tika ana.
  • Ka whai wāhi katoa ngā rōpū ki te tuku i ā rātou take, me te kite me te tuku kōrero mō ngā take a tētahi ki tētahi. Heoi, hei penapena utu, hei whai tukanga whai hua hoki, he herenga kei runga i ngā tukunga: 
  • Ngā tuku kereme me ngā whakautu tae atu ki te 10 whārangi mō ia kereme; ā, 
  • Whakautu, whakahoki hoki i ngā tukunga tae atu ki te rima whārangi mō ia whārangi. 
  • He tūmataiti, he mea huna hoki te ratonga, he rerekē ki ngā whakahaerenga a te kooti. 

Ko tētahi atu kōwhiringa ko te takawaenga . Mā te takawaenga ka taea e te rangatira whenua me te kairihi te whakaae ki tētahi hua e whai hua ana mō te katoa. He mahi tūmataiti, he mahi huna hoki tēnei. Ka taea te penapena i ngā utu tautohe, ā, ka āwhina hoki ki te pupuri i te whanaungatanga tonu a te rangatira whenua me te kairihi. Nā ēnei take, he kōwhiringa pai tēnei hei whakaaroaro . 

Ka tukuna atu hoki e mātou he whakatau a te tohunga . He tino whai hua tēnei mō ngā arotakenga mākete kei reira ngā pūrongo a te rangatira whenua me te kairihi kua rēhitatia, ā, he āputa nui kei waenganui i a rāua. Ka taea e mātou te whakatū i tētahi tohunga motuhake hei whakatau i te putanga i roto i tētahi tukanga tūmataiti me te huna. He huarahi tere, he huarahi whai hua hoki tēnei hei whakatau i te tautohe arotake reti arumoni, ki te whakaritea ki te kooti, ​​ki tētahi whakatau tautohe rānei me tētahi whakawa. 

Mena kei te hiahia koe ki te kōrero anō mō ​​ēnei kōwhiringa, ki te hiahia rānei koe ki ētahi pātai, tēnā whakapā mai ki a mātou i registrar@nzdrc.co.nz , waea mai rānei ki te +64 9 486 7153 mō te kore utu . E harikoa ana mātou ki te āwhina. 

Whakapā mai

Whakakīia te puka hei whakapā atu ki tā mātou tīma kia kite ai me pēhea mātou e āwhina ai, e whakapā mai rānei ki a mātou mō tētahi o ēnei e whai ake nei:

Waea: +64 9 486 7143

Waea Koreutu: 0508 WHARE

Waea Koreutu: 0508 284 534

Ngā Hāora Tari: Mane ki te Paraire 8:30 i te ata ki te 5:00 i te ahiahi (haunga ngā hararei tūmatanui)

Whakapā mai

Ētahi atu rauemi ka pai pea ki a koe

Mena i kitea e koe he whai hua tēnei tuhinga, ā, kei te hiahia koe ki te ako atu, he nui ngā rauemi kē atu kei runga i tā mātou paetukutuku. He whānuitanga ā mātou tuhinga me ngā aratohu mō ngā kaupapa maha, kua hangaia ia tuhinga hei whakarato i te māramatanga hohonu ake ki a koe mō te kaupapa. Ka akiaki mātou i a koe kia tūhuratia ēnei rauemi me te whakahōhonu ake i tō mōhiotanga.

Whakataunga

He aha ngā pānga utu o te wero i tētahi whakataunga a te whakatau tautohe mā roto i ngā kōti?

Nā tētahi whakataunga a te Kōti Matua o Hingaiapore i whakaatu tata nei i ngā utu mō te utunga me te wā ka whakaaetia, ā, kāore hoki e whakaaetia, whai muri i te...
Whakataunga

Ā, ki tō whakaaro kei te raru pea tō kirimana hanga?

I roto i te kēhi o Ahitereiria tata nei o Gemcan Constructions Pty Ltd v Westbourne Grammar School [2022] VSC 6, i whakaarohia e te Kōti Matua o Wikitōria he...