Te whiriwhiri i te ara tika ina hē ngā kaupapa hanga whare
Kāore i te maha ngā tautohe hanga whare e pā ana ki ngā tika ture anake. He maha ngā wā, e pā ana ki ngā kaupapa kua mutu, ngā nama kāore anō kia utua, ngā whanaungatanga taupatupatu, ngā tumanakohanga kāore i te mārama, ngā hapa, ngā whakaroa, ngā utu piki haere rānei. I ia wiki, ka pau te wā, te moni, me te arotahi o te hunga katoa e whai wāhi ana ki tētahi tautohe e kore e whakatauhia.
Koia te take kāore te pātai tuatahi e tika ana kia pēnei "Ko wai te mea tika?" Engari me pēnei "He aha te huarahi mohio rawa atu hei whakatau i tēnei?"
He tokomaha rawa ngā rōpū e whakaaro ana ko ngā huarahi anake ko te haere ki te rōia, te haere rānei ki te kooti. Inaa, he maha ngā tautohe hanga whare me te hanganga i Aotearoa ka taea te whakatau pai ake mā roto i ngā tukanga whakatau tautohe tūmataiti motuhake kua hangaia mō ngā āhuatanga tūturu o te rāngai. He maha ngā kōwhiringa a te Taraipiunara Tautohe Hanga Whare, tae atu ki te whakatau, takawaenga , te whakatau tautohe, te whakatau a te tohunga, me ngā tukanga ranu kua whakaritea mō te tautohe.
He aha i hiahia ai ki tētahi huarahi rerekē mō ngā tautohe hanga whare
He rerekē ngā tautohe hanga whare i ngā tautohe arumoni noa. He maha ngā wā ka uru atu ēnei ki:
- ngā rōpū maha me ngā kawenga taupatupatu
- ngā taunakitanga hangarau me ngā kupu motuhake
- ngā kaupapa ora e piki ake ai te utu i ia rā mō te whakaroa
- ngā pēhanga utu e pā ana ki ngā kaimahi kirimana me ngā kaiwhakarato
- mōrearea ingoa me ngā whanaungatanga arumoni tonu
Mā te tukanga puhoi, te tukanga kore rānei e taurite ka kino ake te āhuatanga. Mā te tukanga tika ka taea te pehi i te kino, ka waihanga i te nekehanga ki te whakatau.
He rerekē ngā taputapu e hiahiatia ana mō ngā tautohetohe rerekē
Kāore he whakautu kotahi e tika ana mō te katoa. Ko te whakahaere tautohe pakari ko te whakataurite i te tukanga ki te raruraru.
Ina ko te rere o te moni te take matua
Mō ngā kereme ahunga whakamua kāore anō kia utua, mō ngā wātaka utu tautohetohe rānei, ko te whakatau i raro i te Ture Kirimana Hanga 2002 te huarahi tino whai hua. He mea hanga hei tuku whakatau tere, whai mana hoki kia kore ai e whakararuraru ngā tautohe utu i ngā kaupapa. E pā ana ngā wā ture pakari, nō reira he mea nui te mahi wawe.
Ina he mea nui te whakamutunga
Mena e hiahia ana ngā rōpū ki tētahi whakataunga here, whai mana hoki, me te tūmataitinga me te ngāwari, he huarahi pai pea te whakatau tautohe hei whakakapi i te kōti. He tino whai hua tēnei ina he nui ngā moni, he uaua rawa rānei ngā take mō te whakatau whaimana.
Ina he take hangarau te take tūturu
He mea nui te tiaki i ngā whanaungatanga
Ina hiahia ngā rōpū ki te whai wāhitanga me te tino mohiotanga
Ka tīmata te ārai i roto i te kirimana
He maha ngā tautohe ka uaua ake nā te mea he koretake ngā kirimana, he kore e tukuna i roto i te tukanga, he tuhi rānei me te kore e whai whakaaro ki ngā mea ka puta ina hē te āhua.
Mā ngā rarangi whakatau tautohe kua tuhia pai ka taea te whakaiti i te koretake, te pupuri i te mana whakahaere, me te whakapoto i ngā wā whakatau. Mō ngā tumuaki, ngā kaimahi kirimana, ngā kaitohutohu, me ngā kaimahi kirimana iti, koinei tētahi o ngā taputapu whakahaere mōrearea e warewarehia ana i roto i te hanganga.
Ko te kaiārahi tūturu e pā ana ki tēnei
Ehara i te hunga kāore e tūtaki ki ngā tautohe ngā kaitākaro kaha rawa atu o te umanga. Engari ko rātou te hunga e whakatau tere ana i ngā tautohe, i runga i te ōwehenga, me te kore e wareware ki te tirohanga whānui o te arumoni.
Arā, kia mōhio koe ki te wā e whiriwhiri ai, te wā e takawaenga ai, te wā e whakatau ai, me te wā e tika ai he whakataunga whakamutunga.
Nō reira, he tika te BDT mō tāu tautohe?
Mena he mahi hanga whare, he mahi arumoni rānei tō tautohe—ahakoa he whare noho, he mahi arumoni, he mahi hanganga rānei—ko te pātai pai ake pea ko te mea he pai ake te whakamahi i tētahi tukanga motuhake i te tukanga whānui.
Mā te mārama wawe ki ō kōwhiringa ka taea te penapena i ngā marama o te whakararuraru me te utu nui i muri mai.
Mō ētahi atu kōrero mō ngā huarahi whakatau tautohe i roto i te rāngai hanga, tirohia te Whare Whakawa mō ngā Tautohenga Hanga i buildingdisputestribunal.co.nz .