I mua i te whakaoti i te Pānui Whakatau Take, tēnā pānuihia ēnei aratohu.
Ka whakamahia tēnei Pānui Whakatautau mēnā kua whakaae ngā Rōpū ki te tautohe ki te tuku i tētahi tautohe ki te Whakatautau i raro i ngā Ture Whakatautau BDT, mā te whakaurunga o te Wāhanga Tauira Whakatautau BDT ki roto i tā rātou whakaaetanga/kirimana matua.
Mena kāore anō ngā Rōpū kia whakaae i mua ki te tuku i tētahi tautohe ki te Whakataunga i raro i ngā Ture Whakataunga BDT, me haina e rātou he Whakaaetanga Whakataunga .
Kāore e hiahiatia ana kia whakaoti, kia tukuna hoki he Pānui mō te Whakataunga e ngā rōpū kua haina i tētahi Whakaaetanga Whakataunga, ā, ka taea tonu e rātou te tono mō te whakatūnga o tētahi Kaitautoko mā te whakamahi i te puka tono ipurangi a BDT.
I tēnei wāhanga, whakatakotoria ngā ingoa katoa me ngā taipitopito whakapā mō ia Rōpū me ō rātou Māngai, tae atu ki tētahi wāhitau īmēra o nāianei mō ia Rōpū mēnā e wātea ana, nā te mea koinei te huarahi whakawhitiwhiti kōrero matua e whakamahia ana e te Rēhita.
Kia tūpato kia tika te whakaingoa/te tautuhi i tētahi Rōpū. Hei tauira, mēnā he kirimana tō kamupene, me whakarite kia tika te whakaingoa o te kamupene hei Rōpū kē atu – kaua ko te ingoa hokohoko e whakamahia ana e ia, ko te ingoa rānei o tētahi tangata kua mahi tahi koe. Mēnā he kirimana ki tētahi 'whakawhirinakitanga', whakaingoatia ia kaitiaki i runga i tō rātou tūranga hei kaitiaki o te whakawhirinaki hei Rōpū ki te Takawaenga, arā, ko A rāua ko B hei kaitiaki o te whakawhirinakitanga XYZ.
Me whakarite koe kia whakahuatia ngā ingoa o ngā Rōpū katoa e tika ana (me ō rātou Māngai, mēnā e mōhiotia ana rātou) me te whakauru atu ki te Pānui Whakataunga.
Tērā pea he maha ngā Rōpū kei roto i tō tautohe. Whakatikatikahia tēnei tauira kia whakaratohia ngā taipitopito mō ia Rōpū.
I tēnei wāhanga, me tohu e koe:
(a) te Whakaaetanga Whakataunga e karangatia ana; me
(b) te taputapu ture, te whanaungatanga rānei i ahu mai ai te tautohe, i pā rānei ki tēnei tautohe.
Hei haere tonu ki te Whakataunga, me whakaae ngā Rōpū ki te whakatau i raro i ngā Ture Whakataunga BDT.
I ēnei āhuatanga, ko te mea anake e hiahiatia ana ko te tāpiri i tētahi kape o te whakaritenga e tika ana i roto i te kirimana me tētahi kape o te whārangi whakatinanatanga o te kirimana ki te Pānui Whakatau Take.
I tēnei wāhanga, me whakarāpopoto e koe te āhua o te tautohe. He mea nui kia nui ngā mōhiohio e tukuna ana kia mōhio ai ngā Rōpū katoa me te BDT ki te āhua o te tautohe me ngā take ka puta pea i te Whakataunga.
Mā ngā mōhiohio e pā ana ki te āhua me ngā taipitopito o te tautohe ka āwhina i a BDT ki te whiriwhiri me te whakatū i tētahi Kaitakawaenga i raro i ngā Ture.
I tēnei wāhanga, me whakamārama e koe te mea e rapua ana e koe mō tētahi putanga, ētahi atu putanga rānei mai i te Whakataunga, arā, te utu moni, te whakaaetanga ki te mahi, ki te kore rānei e mahi i tētahi huarahi motuhake, me ētahi atu.
Ko te take o tēnei kia mōhio ai ngā Rōpū ki ngā mea e rapuhia ana e te Rōpū Tuatahi (Kaitono) kia mārama ai rātou ki te whānuitanga me te āhua o ngā kereme i tukuna ki a rātou, ā, kia pai ai hoki te whakarite mō te Whakataunga.
I tēnei wāhanga, ka taea e koe te whakahua i te ingoa me ngā taipitopito o te tangata e whakaarohia ana e koe hei Kaitakawaenga, te wheako/tohungatanga rānei e whakaaro ana koe he mea tika/he āwhina mā te Kaitakawaenga.
Kia mōhio mai, ehara i te mea nui kia tono koe i tētahi hei Kaitakawaenga, kia ngana rānei ngā Rōpū ki te whakaae ki tētahi – i roto i te nuinga o ngā wā, kāore ngā Rōpū me ō rātou Māngai i te nui o te wheako me te mātauranga hei whakatau whai whakaaro. He mātau ngā Kai-rehita o BDT ki te whakatū i te Kaitakawaenga tino tika hei mahi i roto i tētahi take, ā, i te nuinga o ngā wā, ka tīpakohia e BDT te Kaitakawaenga mō te Takawaenga, ā, ka whakatūria hoki e ia.
Ka taea e tētahi Rōpū, i muri i te paunga o ngā Rā Mahi tekau mai i te rā i tukuna ai te Pānui Whakataunga ki ia Rōpū kē atu, i mua atu rānei mēnā kua whakaae ngā Rōpū ki tētahi kaitono, kua hainatia rānei e ngā Rōpū te Whakaaetanga Whakataunga i roto i te puka kei te Tāpiritanga 2 o ngā Ture Whakataunga BDT, te tono ki a BDT kia whakatūria he Kaitautoko mā te whakaoti i tētahi Tono Whakataunga. Me whakauru ki te Tono:
(a) te Whakaaetanga Whakataunga;
(b) te Pānui mō te Whakataunga (mēnā e tika ana);
(c) tetahi tuhinga e whakaatu ana i te whakaaetanga a ngā Rōpū mō te Kaitakawaenga, mēnā rānei kāore anō kia tae ki tētahi whakaaetanga:
i. tetahi tono mō te Kaitakawaenga, ā, mēnā kei te wātea, tetahi whakautu ki taua tono; ā,
ii. tetahi tuhinga e whakaatu ana i te whakaaetanga a ngā Rōpū mō te tohungatanga pai o te Kaitakawaenga, i te wā rānei kāore anō kia tae ki tētahi whakaaetanga, tetahi tono mō te tohungatanga pai o te Kaitakawaenga, ā, mēnā kei te wātea, tetahi whakautu ki taua tono.
Ka taea te tuku tono mā te ipurangi, mā te ngāwari hoki i konei .
Mena he pātai, he āwangawanga rānei āu e pā ana ki ō tika me ō herenga ture, ka tino taunaki mātou kia rapu tohutohu ture motuhake koe mai i tētahi rōia e mōhio ana ki te takawaenga.
Ka tūtohu mātou kia whakamātau koe i te Rapu Roia a NZLS kia kitea ai he tangata ka taea te tuku i ngā tohutohu e hiahiatia ana e koe .
Mā konei ka tukuna e [TE RŌPŪ TUATAHI] he pānui tuhituhi mō tōna hiahia ki te tuku i tētahi tautohe ki [TE RŌPŪ TUARUA] ki te Ratonga Whakataurite i runga anō i ngā Ture Whakataurite o te Taraipiunara Tautohe Whare.
Whakaratohia ngā ingoa me ngā taipitopito whakapā o ia Rōpū ki te Takawaenga e whakaarohia ana.
Rōpū Tuatahi: | Whakarongo:
| |
|---|---|---|
Wāhitau mō te ratonga: | ||
Waea: | ||
Īmēra: | ||
Māngai: | ||
Ingoa o te umanga: | ||
Wāhitau: | ||
Waea:
| ||
Īmēra: | ||
Rōpū Tuarua: | Whakarongo:
| |
|---|---|---|
Wāhitau mō te ratonga: | ||
Waea: | ||
Īmēra: | ||
Māngai: | ||
Ingoa o te umanga: | ||
Wāhitau: | ||
Waea:
| ||
Īmēra: | ||
Kua puta te tautohe mai i, e pā ana rānei ki, [whakahuatia te tuhinga ture, te whanaungatanga rānei mai i, e pā ana rānei ki, te takenga mai o te tautohe] .
Ko te whakaaetanga a ngā rōpū ki te whakatau i tēnei tautohe i raro i ngā Ture Whakataunga BDT ko [tautuhi i te Whakaaetanga Whakataunga] .
(He tārua o te Whakaaetanga Whakataunga kua tāpirihia)
[whakatakotohia he whakamārama poto mō te āhua o te tautohe]
E whai ana a [Te Rōpū Tuatahi] i ngā hua e whai ake nei:
Ko ngā whakaaro a [Te Rōpū Tuatahi] e pā ana ki te tuakiri me/ranei te wheako, te tohungatanga rānei o te Kaitakawaenga:
I tuhia tēnei rā | Te Rā o | (marama) | (tau) |
Waitohu |
Ingoa |
Pāwhiritia te hononga i raro nei hei tango i tā mātou aratohu whānui me te tauira.