He aratohu mō te whakaoti i te Pānui Arb-med

I mua i te whakaoti i te Pānui mō Arb-Med, tēnā pānuihia ēnei aratohu.

NGĀ TUHIPOKA HIRANGA:

Ka whakamahia tēnei Pānui Arb-Med mēnā kua whakaae ngā Rōpū ki te tautohe ki te tuku i tētahi tautohe ki te Whakataunga i raro i ngā Ture BDT Arb-Med , mā te whakauru i te Wāhanga Tauira BDT Arb-Med ki roto i tā rātou whakaaetanga/kirimana.

Mena kāore anō ngā Rōpū kia whakaae i mua ki te tuku i tētahi tautohe ki te Whakataunga i raro i ngā Ture BDT Arb-Med, me haina e rātou he Whakaaetanga Arb-Med i te puka kei te Tāpiritanga 2 o ngā Ture BDT Arb-Med hei haere tonu.

Kāore e hiahiatia ana kia whakaoti, kia tukuna atu hoki tēnei Pānui Arb-Med e ngā rōpū e haina ana i tētahi Whakaaetanga Arb-Med i roto i te puka kei te Tāpiritanga 2 o ngā Ture Arb-Med a te BDT, ā, ka taea tonu te tono mō te whakatūnga o te Taraipiunara Whakatau Take mā te whakamahi i te puka tono ipurangi a te BDT.

Ngā Rōpū me ō rātou Māngai

Whakatakotoria ngā ingoa katoa me ngā taipitopito whakapā mō ia Rōpū me ō rātou Māngai, tae atu ki tētahi wāhitau īmēra o nāianei mō ia Rōpū, nā te mea koinei te huarahi whakawhitiwhiti kōrero matua e whakamahia ana e te Rēhita.

Kia tika te whakaingoa/tāutu i tētahi Rōpū. Hei tauira, ko te Kamupene katoa, ko te ingoa tika – ehara i te ingoa hokohoko, ehara hoki i te ingoa o tētahi tangata kua mahi tahi koe. Mena he kirimana kei roto i tētahi 'whakawhirinakitanga', whakaingoatia ia kaitiaki i runga i tō rātou tūranga hei kaitiaki o te whakawhirinakitanga hei Rōpū ki te tukanga Arb-Med, arā, ko A rāua ko B hei kaitiaki o te whakawhirinakitanga XYZ .

Me whakarite kia whakaurua ngā Rōpū katoa e tika ana (me ō rātou Māngai, mēnā e mōhiotia ana) ki te Pānui a Arb-Med.

Ngā Rōpū Maha

Mena he maha ngā Rōpū, whakarerekētia tēnei tauira kia puta ai ngā taipitopito mō ia Rōpū.

Whakaaetanga Arb-Med

Tauwhāitihia:

(a) te Whakaaetanga Arb-Med e karangatia ana; ā,

(b) te kirimana, te tuhinga ture, te whanaungatanga rānei i ahu mai ai te tautohe, i pā rānei ki tēnei.

Me whakaae ngā Rōpū ki te whakatau i raro i ngā Ture BDT Arb-Med . He mea nui kia whai Whakaaetanga Arb-Med kua hainatia tika i mua i te haere tonu.

Tērā pea ka whakaurua te rarangi BDT e whai ake nei (tērā atu rānei he pānga rite) ki roto i te kirimana:

Ko ngā tautohe, ngā rerekētanga rānei e puta ake ana i tēnei kirimana, e pā ana rānei ki tēnei kirimana, ki te kaupapa rānei o tēnei kirimana, tae atu ki tētahi pātai mō tōna oranga, tōna mana, tōna whakamutunga rānei, me tuku atu ki te whakatau ā-tau, ā, me whakatau whakamutunga mā te whakatau ā-tau i runga anō i ngā Ture Arb-Med o te Taraipiunara Tautohe Hanga Whare.

Mena koinā te āhua, ko te mea anake e hiahiatia ana ko te tāpiri i tētahi kape o te rarangi me tētahi kape o te whārangi whakatinanatanga o te kirimana ki te Pānui a Arb-Med.

Ki te kore, ki te kore ngā Rōpū i whakauru i te Tauira Arb-Med o te BDT ki roto i tētahi whakaaetanga o mua, ka taea e rātou te tuku i te tautohe ki te Whakataunga i raro i ngā Ture Arb-Med o te BDT mā te haina i te Whakaaetanga Arb-Med i te Tāpiritanga 2 o ngā Ture. I muri i te whakatinanatanga o taua whakaaetanga, ka tono tonu ngā Rōpū mō te whakatūnga o tētahi Taraipiunara Whakataunga mā te whakamahi i te puka tono ipurangi a te BDT. Kāore he take ki te whakaoti i tēnei Pānui Arb-Med.

Te Tautohe

Whakatakotoria he whakarāpopototanga o te tautohe. Me hoatu he mōhiohio e ranea ana kia mōhio ai ia Rōpū me te BDT ki te āhua o te tautohe me ngā take ka whakaarahia i roto i te tukanga Arb-Med.

Mā ēnei mōhiohio ka āwhina i a BDT ina hiahiatia kia whiriwhiria me te whakatūria he kaiwhakawa i raro i ngā Ture.

Te whakaoranga o te rongoā i rapua

Tauwhāitihia te awhina, te rongoā rānei e rapu ana koe, arā, te utu moni, te awhina whakapuakitanga rānei.

Mā tēnei ka mārama ngā Rōpū katoa ki te mea e rapuhia ana e te Kaitono, ā, ka mārama hoki ngā Kaiwhakautu katoa ki te whānuitanga me te āhua o ngā kereme i tukuna ki a ia.

Te whakaaro mō te hanganga o te Taraipiunara Whakatau Take

Ka taea e koe te whakahua i te ingoa me ngā taipitopito o te tangata e whakaarohia ana e koe hei kaiwhakatau, te wheako/tohungatanga rānei e whakaaro ana koe he mea tika/he āwhina mā te kaiwhakatau.

Kāore he mea nui kia tono koe i tētahi hei kaiwhakatau, kia ngana rānei ngā Rōpū ki te whakaae ki te hanganga o te Taraipiunara Whakatau. He mātau ngā Kai-rehita o BDT ki te whiriwhiri me te whakatū i ngā kaiwhakatau, ā, i te nuinga o ngā wā, ka whiriwhiria e BDT te Taraipiunara Whakatau, ka whakatūria hoki.

Te tuku tono ki te BDT

Ka taea e te Kaitono, i muri i te paunga o ngā rā mahi tekau mai i te rā i tukuna ai te Pānui Arb-Med ki ia Rōpū kē atu, i mua atu rānei mēnā kua whakaae ngā Rōpū ki tētahi kaitono, kua hainatia rānei e ngā Rōpū te Whakaaetanga Arb-Med i roto i te puka kei te Tāpiritanga 2 ki ngā Ture Arb-Med a te BDT, te tono ki a BDT kia whakatūria te Taraipiunara Whakatau Take mā te whakaoti i tētahi Tono mō Arb-Med. Me whakauru ki te Tono:

(a) te Whakaaetanga Arb-Med;

(b) te Pānui a Arb-Med (mēnā e tika ana);

(c) tetahi tuhinga e tuhi ana i te whakaaetanga a ngā Rōpū mō te hanganga o te Taraipiunara Whakatau Take, mēnā rānei kāore anō kia tae ki tētahi whakaaetanga:

i. tetahi whakaaro mō te hanganga o te Taraipiunara Whakatau Take, ā, mēnā kei te wātea, tetahi whakautu ki taua whakaaro; ā,

ii. tetahi tuhinga e whakaatu ana i te whakaaetanga a ngā Rōpū mō ngā tohungatanga pai o te Taraipiunara Whakatau Take, i te wā kāore anō kia tae ki tētahi whakaaetanga, tetahi tono mō ngā tohungatanga pai o te Taraipiunara Whakatau Take, ā, mēnā kei te wātea, tetahi whakautu ki taua tono.

Ka taea te tono mā te ipurangi.

Tohutohu ture

Mena he pātai, he āwangawanga rānei āu e pā ana ki ō tika me ō herenga ture, ka tino taunaki mātou kia rapu tohutohu ture motuhake koe mai i tētahi rōia e mōhio ana ki te takawaenga me te whakatau tautohe.

Ka tūtohu mātou kia whakamātau koe i te Rapu Roia a NZLS kia kitea ai he tangata ka taea te tuku i ngā tohutohu e hiahiatia ana e koe .

Pānui mō Arb-Med

Kei konei a [TE KAITOHU] e tuku pānui tuhituhi ana mō tōna hiahia ki te tuku i tētahi tautohe ki a [TE KAIWHAKAUTU] ki te Arbitration i runga anō i ngā Ture Arb-Med o te Whare Whakawa mō ngā Tautohe Hanga Whare.
 

Ngā Rōpū

Rōpū Tuatahi:
Whakarongo:
Wāhitau mō te ratonga:
Waea:
Īmēra:
Māngai:
Ingoa o te umanga:
Wāhitau:
Waea:
Īmēra:
Rōpū Tuarua:
Whakarongo:
Wāhitau mō te ratonga:
Waea:
Īmēra:
Māngai:
Ingoa o te umanga:
Wāhitau:
Waea:
Īmēra:

Whakaaetanga Arb-Med

Kua puta te tautohe mai i, e pā ana rānei ki, [whakahuatia te tuhinga ture, te whanaungatanga rānei mai i, e pā ana rānei ki, te takenga mai o te tautohe] .

Ko te whakaaetanga a ngā rōpū ki te whakatau i raro i ngā Ture BDT Arb-Med ko [tautuhi i te Whakaaetanga Arb-Med] .

( Kua tāpirihia he kape o te Whakaaetanga Arb-Med ) 

tautohe

[Tuhia he whakamārama poto mō te āhua o te tautohe]

He awhina, he rongoā rānei e rapua ana

E tono ana a [CLAIMAN] i te awhina, i te rongoā rānei e whai ake nei:

Te whakaaro mō te hanganga o te taraipiunara whakatau

[KAITOHU] e whakaaro ana mō te tuakiri me/ranei te wheako, te tohungatanga rānei o te Taraipiunara Whakatau Take:

I tuhia tēnei rā
Te Rā o
(marama)
(tau)
Waitohu
Ingoa

Tikiake i te tauira

Pāwhiritia te hononga i raro nei hei tango i tā mātou aratohu whānui me te tauira.