Whakaaetanga ki te Takawaenga

Mā te Whakaaetanga

I tuhia tēnei rā
Te Rā o
(marama)
(tau)

I WAENGANUI

Kaitono

Ā,

Kaiwhakautu

Ngātahi, ngā Rōpū

Ko ngā Rōpū he rōpū ki:

Tautuhia te whanaungatanga ture

I uru atu ki te, i te tata rānei ki

Whakauruhia te rā

Mō, mō, mō rānei e pā ana ki:

Whakauruhia ngā taipitopito

Kua whakaae ngā Rōpū [ko ngā take katoa e tautohetia ana i waenganui i a rātou / ko ngā take e tautohetia ana i waenganui i a rātou kua whakatakotoria ki te Āpitihanga kua tāpirihia (mukua tētahi) ] me tuku ki te Whakataunga i runga anō i ngā Ture Whakataunga o te Taraipiunara Tautohe Whare ( Ngā Ture Whakataunga BDT ).

I te whakatinanatanga o tēnei Whakaaetanga Whakataunga, ka taea e tētahi Rōpū te tīmata i te Whakataunga mā te whakaoti i tētahi Tono Whakataunga e ai ki te Ture 3.4.

Hei karo i te ruarua, i raro i tēnei Whakaaetanga Whakataunga, kāore te Kaitono e hiahiatia kia tuku Pānui Whakataunga i raro i te Ture 3.1 hei tīmata i te Whakataunga, kia tāpirihia rānei taua Pānui ki te Tono Whakataunga i raro i te Ture 3.4(b).

Ngā Pānui ki te Rōpū Tuatahi:

Me tuku ngā Pānui ki te Rōpū Tuatahi ki tētahi wāhitau hei tuku, arā, ki:
Waea:
Waea Pūkoro:
Īmēra:

Ngā Pānui ki te Rōpū Tuarua:

Me tuku ngā Pānui ki te Rōpū Tuarua ki tētahi wāhitau hei tuku, arā,:
Waea:
Waea Pūkoro:
Īmēra:

E whakaatu ana ahau: Kua pānuihia e au, ā, kua mārama hoki ki tēnei Whakaaetanga Whakataunga me ngā Ture Whakataunga a te NZIAC; ā,

E whakaae ana ahau kia herea ahau e ngā tikanga o tēnei Whakaaetanga Whakataunga me ngā Ture Whakataunga a te NZIAC.

Rōpū Tuatahi
Rōpū Tuarua
Waitohu
Ingoa:
Ingoa:
Tūranga:
Tūranga:
I te aroaro o:
Ingoa:
Ingoa:
Wāhitau:
Wāhitau:
Te mahi:
Te mahi:

TE ARATOHU O NGĀ TAKE E WHAKATAUTAU ANA MŌ TE WHAKATAUNGA

Kua whakaae ngā Rōpū ko ngā take e tautohetia ana e whai ake nei hei tuku ki te Hui Whakatau:

(a) [ ]

(b) [ ]

Tikiake i te tauira

I mua i te whakaurunga ki te Whakataunga, me whakaae ngā Rōpū ki tētahi tautohe ki te whakatau. Mēnā kāore anō kia whakaae rātou ki te tuku i tētahi tautohe ki te Whakataunga i raro i ngā Ture Whakataunga a te Taraipiunara Whakakore Tautohe, ka taea e rātou te mahi pēnā mā te whakaoti i tēnei Whakaaetanga Whakataunga.

Me whakauru te Wāhanga Tauira o te Taraipiunara Tautohe Hanga Whare ki roto i ngā kirimana hou katoa e hiahia ana ngā rōpū kia tukuna ngā tautohe a meake nei ki te Whakataunga me NZIAC.