Ngā aratohu mō ngā taunakitanga a ngā tohunga

Ko te kaupapa o ēnei Aratohu he āwhina i ngā tohunga, i ngā Rōpū, me ō rātou Māngai, kia mārama ki ngā herenga a ngā tohunga me ngā whakaritenga a te BDT e pā ana ki te whakarite i ngā pūrongo, te Takawaenga, ngā huihuinga tahi a ngā tohunga, me te whakarongo ki ngā taunakitanga ōrite i roto i te Arb-Med i raro i ēnei Ture.

1.0 Te pūrongo a te tohunga

1.1 E hiahia ana a BDT kia mārama ngā tohunga ki ō rātou kawenga me ā rātou herenga, ā, kia whakamahia, kia whāia hoki tētahi huarahi whānui mō te whakarite pūrongo.

1.2 Me mārama te kī a te pūrongo a te tohunga:

  • (a) ngā tohu mātauranga o te tohunga me te tohungatanga me ngā wheako e pā ana ki ngā take e pā ana ki te pūrongo;
  • (b) ngā take e arohia ana e ngā taunakitanga a te tohunga;
  • (c) kei roto ngā taunakitanga i te mara o te tohungatanga, ā, mēnā e tika ana, ko ngā take kei waho o te tohungatanga o te tohungatanga;
  • (d) ngā tohutohu katoa e whakamārama ana i te whānuitanga o te pūrongo, o ngā taunakitanga rānei, arā, te taketake me te tāpiri, ā, ahakoa he mea tuhituhi, he mea kōrero rānei;
  • (e) ngā meka me ngā whakapae e ahu mai ana ngā whakaaro o te tohunga; ā,
  • (f) te whakaaro o te tohunga mō ngā take i tukuna atu ki a ia, i runga i ngā pararāfu (a) ki te (e) i runga ake nei, me ngā take mō ngā whakaaro i tukuna e te tohunga.

1.3 Me whakamārama te pūrongo i ngā tuhinga, i ngā mātauranga pūtaiao whānui, i ētahi atu rauemi rānei i whakamahia, i whakawhirinakihia rānei hei tautoko i ngā whakaaro i whakapuakina e te tohunga.

1.4 Me whakaahua e te pūrongo ngā whakamātautau, ngā rangahau rānei i whakawhirinakihia e te tohunga, me te hoatu hoki i ngā taipitopito me ngā tohu o te tangata nāna i whakahaere.

1.5 Kaua ngā tohunga hangarau e tuku kōrero, e ripoata rānei mō ngā pātai ture mō te kawenga.

1.6 Me whakamōhio e te tohunga e whakarerekē ana i tana whakaaro mō tētahi take nui i runga i te pūrongo a tētahi atu tohunga, i tētahi atu take rānei, te panonitanga o te whakaaro ki te Rōpū e pupuri ana i te tohunga, ā, me tuku tonu e taua Rōpū ki te Taraipiunara Whakatau Take me ia Rōpū kē atu ki te whakahaerenga, he pānui mō taua panonitanga o te whakaaro, ā, me whakamārama i te pānui te take, ngā take rānei i panoni ai te whakaaro o te tohunga.

2.0 Huihuinga tahi a ngā tohunga

2.1 Hei whakaiti i te roa me te uaua o ngā whakawakanga, ka whakahaua ngā tohunga kia tūtaki me te kōrero tahi me ētahi atu tohunga kia whakaaetia ai ngā take e pā ana ki te tohungatanga o ngā tohunga, kia whakaritea ai hoki he tauākī tahi e whakaatu ana i ngā take e whakaaetia ana e ngā tohunga, ngā take kāore e whakaaetia ana e rātou, me ngā take mō tā rātou whakahē.

2.2 Ka taea te whakahaere i te hui tahi a ngā tohunga i tētahi wāhi e whakaaetia ana e ngā Rōpū, i tētahi wāhi rānei e whakahaua ana e te Taraipiunara Whakatau Take, mēnā kāore he whakaaetanga.

2.3 Me noho muna ngā take i kōrerohia i waenganui i ngā tohunga i te hui ki aua tohunga, ā, kaua e tukuna ki te whakawakanga mēnā kāore ngā Rōpū i whakauru atu ki ngā tohunga e whakaae katoa. Heoi anō, ka tuwhera te whakapuakitanga tahi.

2.4 Me hainatia te tauākī tahi e ngā tohunga i te mutunga o te hui.

2.5 Me tuku e te Kaitono te tauākī tahi ki te Taraipiunara Whakatau Take me ia Rōpū kē atu i roto i ngā rā e rua o te hui.

2.6 Kāore e whakaaetia ngā Rōpū me/ranei ō rātou Māngai kia tae atu ki te huihuinga tahi a ngā tohunga, ā, kaua hoki rātou e arotake i tētahi kape o te tauākī tahi i mua i te whakaotinga me te hainatanga a ngā tohunga.

3.0 Te tauākī tahi

3.1 E tūmanakohia ana i roto i te whakarite i te tauākī tahi, ka kōrero tahi ngā tohunga, ā, ka whakapau kaha ki te whakaae ki ngā take katoa e pā ana ki roto i tā rātou mara mātauranga, ka whakawhāiti i ngā rerekētanga i waenganui i a rātou, ā, ka tautuhi i ngā rerekētanga e toe ana. Hei wāhanga o taua tukanga, ka whakaae pea ngā tohunga ki tētahi whānuitanga o ngā mahi hei whakamātautau me te aroturuki anō, me tētahi wātaka mō te whakahaere i aua whakamātautau me te aroturuki.

3.2 Ahakoa e wātea ana ngā tohunga ki te whakahē, me ahu mai taua whakahē i te whakamahi noa i ō rātou ake whakatau ngaio motuhake. Kaua ngā tohunga e awehia, e mahi rānei i runga i tētahi tohutohu, i tētahi tono rānei kia kaua e whakaaetia, kia karohia rānei.

3.3 I roto i te horopaki o tētahi huihuinga tahi a ngā tohunga, tera pea ka kitea whānuitia ngā meka e tika ana. Ko te whakaritenga o te tauākī tahi he mea hei āwhina i ngā tohunga ki te whakaaro anō me te whakahou i ō rātou whakaaro i ngā wā e tika ana i roto i tētahi taiao ngaio, kāore hoki e tautohetohe mēnā ka wātea mai he taunakitanga hou me ngā rauemi e tika ana.

3.4 Me whai i roto i tētahi tauākī tahi:

  • (a) tautuhia ngā wāhanga e whakaaetia ana, e whakahēngia ana hoki, me ngā take mō tētahi whakahē;
  • (b) tāpirihia ētahi atu taunakitanga; me
  • (c) me hainatia e ngā tohunga katoa i whai wāhi ki te hui tahi a ngā tohunga i mua i te tukunga ki te Taraipiunara Whakatau Take me ngā Rōpū.

4.0 Ngā taunakitanga tohunga e whai tahi ana

4.1 Me tumanako ka whakarongohia ngā taunakitanga tohunga katoa i te wā kotahi, ki te kore he tohunga kotahi e whakatūria, ki te kore rānei e whakahaua e te Taraipiunara Whakatau kia tukuna ngā taunakitanga tohunga i tētahi atu huarahi. Mā te tukanga ka taea e ngā tohunga te whakapuaki i ō rātou whakaaro mō tētahi kaupapa motuhake i roto i ā rātou ake kupu, me te whakautu i ngā pātai mai i te Taraipiunara Whakatau, ngā Māngai o ngā Rōpū, me ō rātou hoa mahi ngaio.

4.2 I raro i te whakatau a te Taraipiunara Whakatau Take, ko te whakarongo ki ngā taunakitanga ōrite ka whakahaerehia i runga i te kaupapa e whai ake nei:

  • (a) ka oatitia ngā tohunga i te wā kotahi;

  • (b) ko te tauākī tahi te pūtake o ngā taunakitanga e whai ake nei;

  • (c) mā te Taraipiunara Whakatau Take e tautuhi, mā te āwhina a ngā Māngai o ngā Rōpū, me te aroaro hoki o ngā tohunga, ngā kaupapa e tika ana kia matapakihia hei whakatau i ngā take kāore anō kia whakatauhia;

  • (d) ka tono te Taraipiunara Whakatau Take ki ia tohunga kia whakarāpopoto poto i te tūnga o te tohunga mō te take tuatahi;

  • (e) ka whai ake te kōrero whānui mō te take, ā, i taua wā ka taea e ngā tohunga te pātai tetahi ki tetahi, me te matapaki i ngā take;

  • (f) ka taea e te Taraipiunara Whakatau Take te pātai ki tētahi o ngā tohunga, ā, ka tonoa ngā Māngai o ngā Rōpū ki te pātai i ā rātou ake pātai, i tētahi atu kaiwhakaatu rānei; ā

  • (g) ka matapakihia ia kaupapa, ia take rānei i ia wā.