Ngā Whakataunga a te Tohunga

2015

Bidois v Leef [2015] NZCA 176 18 Mei 2015 (Te Kōti Pīra o Aotearoa)

Te piira mai i te whakataunga ki te whakakore i te whakataunga i runga i te whakaaro kāore te tautohe i te mea e taea ai te whakauru ki roto i tētahi whakaaetanga whakatau tautohe i raro i te ture – wāhanga 2 Ture Whakatau Tautohe – te tikanga o te whanaungatanga ture kua tautuhia – te tika ā-taiao – te pakanga pānga me ngā tika whakarongo tika – te whakatau tautohe, te whakatau tohunga rānei – Wāhanga 1, tuhinga 4 Te whakakorenga i te tika ki te whakahē

I whakatau te Kōti Pīra he whanaungatanga ture kua tautuhia, me te kī he hē te kī ko te take e whakatauhia ana me whakatau i te mutunga o te whakataetae katoa i waenga i ngā rōpū [50] me te whakatau he pānga tika tā te whakatau i te tika ki te whai wāhi ki ngā moni whiwhi [52]. I te titiro ki te horopaki whānui, i makona te Kōti ka taea te waiho te take i waenga i ngā rōpū hei kaupapa o tētahi whakaaetanga whakatau.

I whakakahoretia hoki e te Kōti te tautohe e kore e taea e tetahi rōpū te whakahē i te whakatūnga o tētahi kaiwhakawa i te wā e mōhio ana ia ki te pakanga e tika ana, engari ka whakaaetia kia whakahē i tētahi wā i muri mai (whai muri i te whakaputanga o te whakataunga). Kāore hoki i kitea he takahi tukanga e pā ana ki te korenga o te whakarato i tētahi kape o ngā tuhinga i whakawhirinakihia ki tētahi atu taha (ko aua tuhinga kei te wātea). I whakatau te Kōti ko ngā mea i puta i ahu mai i te tukanga i whakaaetia e ngā rōpū [93].

Kua whakaaetia te piira.

2014

Bidois v Leef [2014] NZCA 271 25 Pipiri 2014 (Te Kōti Pīra o Aotearoa)

wāhanga 2 Ture Whakatau Tautohe 1996 – te tikanga o te whanaungatanga ture kua tautuhia – te tono mō te whakaaetanga ki te tāpiri atu i ngā taunakitanga hei tautoko i te piira ki te whakataunga a Andrews J. te kitenga kāore te tautohe mana whenua i te tautohe "e pā ana ki tētahi whanaungatanga ture kua tautuhia" ā, nō reira ehara i te whakatau tautohe

Me hou, me pono, me whai kiko hoki ngā taunakitanga tāpiri, ā, e kore e kiia he hou mēnā i taea te tuku mai i te whakawakanga me te āta whakaaro nui. Ko ngā taunakitanga kāore i te hou ka whakaaetia anake i roto i ngā āhuatanga motuhake me ngā āhuatanga whakahihiri [15].

I whakaaetia te tono i runga i te whakaaro, ahakoa i ara ake te pātai mēnā he tukanga whakawakanga whakatau tautohe te tukanga i te wā o te whakawakanga, te āhua nei i arohia tētahi atu āhuatanga o aua pātai, arā, mēnā i whakaaro ngā rōpū ki te tuku ki te whakawakanga tautohe, ki tētahi whakataunga rānei a te tohunga.

2013

TTAH Limited v Koninklijke Ten Cate NV [2013] NZHC 3029 14 Whiringa-ā-rangi 2013 (Te Kōti Matua o Aotearoa)

 

Lighter Quay Residents' Society Inc v Ors v Waterfront Properties (2009) Ltd [2013] NZHC 2678 15 Oketopa 2013 (Te Kōti Matua o Aotearoa)

 

Leef v Bidois [2013] NZHC 1349 10 Pipiri 2013 (Te Kōti Matua o Aotearoa) 

2012

Mariteq Fabricators Ltd v Quigley's Technical Services Ltd CIV 2012-470-533 12 Whiringa-ā-rangi 2012 (Te Kōti Matua o Aotearoa)

 

TTAH Limited v Koninklijke Ten Cate NV CIV-2010-404-8250 18 Pipiri 2012 (Te Kōti Matua o Aotearoa) 

2003

Methanex Motunui Ltd v Spellman [2004] 1 NZLR 95 18 Ākuhata 2003 (Te Kōti Matua o Aotearoa)

whakatau a te tohunga – ahakoa he whakatau a te tohunga, he whakatau tautohe rānei

I roto i ētahi atu kōrero, i whakatau te Kōti, i te whakamāramatanga o te Ture Whakatau Tautohe 1996, me whakataurite ngā kaupapa o te whakamutunga me te mana motuhake o te rōpū ki te whakaaro kia whakawhiwhia ngā rōpū ki ngā paerewa iti rawa o te tiakitanga tukanga. I tēnei take, i whakapuaki ngā rōpū i a rātou anō i roto i tētahi āhua whakahē mā te whakatū i tētahi tohunga hei whakatau i te take, me te kī ko te tukanga he whakatau tautohe. Ahakoa me whakatau te take mā te tautuhi i te whakaaro matua o te kirimana, ina whakamahia e ngā rōpū te reo o te whakatau tautohe, kāore te Kōti e whakaaro noa he whakataunga tohunga noa iho te kaupapa e aukati ana i ngā ture o te tika tūturu.