Whakaaetanga Whakapūmau mō ngā Kore-Rōpū (Whakataunga Whakatau)

Kua pānuihia e au, ā, kua mārama hoki ahau kei raro ahau i ngā Ture 38.2-38.7 o ngā Ture Whakatau Tautohenga BDT. E mārama ana ahau mā te whai wāhi atu, te mōhio rānei ki ngā Whakatau Tautohenga BDT, kei raro ahau i ēnei Ture.

E mārama ana ahau kāore au e whakaae kia whakaaturia ngā mōhiohio katoa i riro mai i te wā o te Whakataunga, tae atu ki te meka o te Whakataunga, engari i raro i ngā Ture 38.4-38.7.

E mārama ana ahau he kawenga huna tāku ki ngā Rōpū katoa, ki te BDT, ki te Taraipiunara Whakatau Take, me ērā atu rōpū kāore i te whai wāhi ki te Whakatau Take, ā, ki te kore e tutuki i ahau tēnei kawenga, ka pāngia pea ahau e ngā hua ture.

E mārama ana ahau mēnā kei te hiahia ahau ki te whakapuaki i tētahi Mōhiohio Matatapu, me whakamōhio atu ahau ki ngā tāngata katoa kua whakarārangihia i roto i te Ture 38.5.

I tuhia tēnei rā
Te Rā o
(marama)
(tau)
Waitohu
Ingoa

Tikiake i te tauira

He tukanga tūmataiti, he tukanga huna hoki te whakatau tautohe. Me haina e ngā tāngata katoa ehara i te rōpū, tae atu ki ngā Māngai, te Whakaaetanga Huna a te BDT mō ngā Ehara i te Rōpū hei whakaritenga mō tā rātou whai wāhi atu ki tētahi Whakatau Tautohe BDT.