Mā te Whakaaetanga
I tuhia tēnei rā | Te Rā o | (marama) | (tau) |
I WAENGANUI
Kaitono |
Ā,
Kaiwhakautu |
Ngātahi, ngā Rōpū
Ko ngā Rōpū he rōpū ki:
Tautuhia te whanaungatanga ture |
I whakaurua ki te, i te rānei mō:
Whakauruhia te rā |
Mō, mō, mō rānei e pā ana ki:
Whakauruhia ngā taipitopito |
Kua whakaae te Kaitono me te Kaiwhakautu [ko ngā take katoa e tautohetia ana i waenganui i a rāua / ko ngā take e tautohetia ana i waenganui i a rāua kua whakatakotoria ki te Āpitihanga kua tāpirihia ( mukua tētahi ) ] me tuku ki te Arbitration mō te whakataunga whakamutunga i runga anō i ngā Ture Arb-Med o te Whare Whakawa mō ngā Tautohenga Hanga Whare ( Ture BDT Arb-Med ).
Kotahi te tokomaha o ngā kaiwhakawa. [ ka taea rānei te whiriwhiri i te toru ]
Ko te reo hei whakamahi mā te tukanga Arb-Med ko te reo Pākehā. [ whiriwhiria rānei tētahi atu reo ]
Ko te ture whakahaere o te kirimana ko te ture matua o Aotearoa. [ whiriwhiria rānei tētahi atu whenua ]
I te whakatinanatanga o tēnei Whakaaetanga Arb-Med, ka taea e tētahi rōpū te tīmata i te Arb-Med mā te whakaoti i tētahi Tono mō Arb-Med e ai ki te Ture 5.4.
Hei karo i te ruarua, i raro i tēnei Whakaaetanga Arb-Med, kāore te Kaitono e hiahiatia kia tuku Pānui Arb-Med i raro i te Ture 5.1 hei tīmata i a Arb-Med, hei tāpiri rānei i taua Pānui ki te Tono mō Arb-Med i raro i te Ture 5.4(b).
Me tuku ngā Pānui ki te Kaitono ki tētahi wāhitau hei tuku atu, arā: | Waea: | ||
|---|---|---|---|
Waea Pūkoro: | |||
Īmēra: | |||
Me tuku ngā Pānui ki te Kaiwhakautu ki tētahi wāhitau hei tuku atu, arā, ki: | Waea: | ||
|---|---|---|---|
Waea Pūkoro: | |||
Īmēra: | |||
E whakaatu ana ahau: Kua pānuihia e au, ā, kua mārama hoki ki tēnei Whakaaetanga Arb-Med me ngā Ture BDT Arb-Med; ā
E whakaae ana ahau kia herea ahau e ngā tikanga o tēnei Whakaaetanga Arb-Med me ngā Ture BDT Arb-Med.
Kaitono | Kaiwhakautu | Waitohu | |
|---|---|---|---|
Ingoa: | Ingoa: | ||
Tūranga: | Tūranga: | ||
I te aroaro o: | |||
Ingoa: | Ingoa: | ||
Wāhitau: | Wāhitau: | ||
Te mahi: | Te mahi: | ||
Kua whakaae ngā Rōpū ko ngā take e tautohetia ana e whai ake nei hei tuku ki a Arb-Med:
I mua i te whakaurunga ki te Whakataunga, me whakaae ngā Rōpū ki tētahi tautohe ki te whakatau. Mēnā kāore anō kia whakaae rātou ki te tuku i tētahi tautohe ki te Whakataunga i raro i ngā Ture Arb-Med a BDT, ka taea e rātou te mahi pēnā mā te whakaoti i tēnei Whakaaetanga Arb-Med.
Me whakauru te Wāhanga Tauira BDT ki roto i ngā kirimana hou katoa e hiahia ana ngā rōpū kia tukuna ngā tautohe a meake nei ki a Arb-Med me BDT.