He kupu whakataki poto ki te Whakatau

He aha te whakatau?

He tukanga whakatau tautohe tere ahurei, ahurei hoki te whakatau i ngā tautohe hanga whare me te hanganga i raro i te Ture, te whakataunga whakawa. Koinei te tukanga whakatau tautohe e whakamahia whānuitia ana hei whakatau i aua tautohe.

He tere te whakatau, ā, he iti hoki te utu. Ko te nuinga o ngā tautohe ka whakatauhia i roto i ngā wiki e ono mai i te wā i tīmata ai te tukanga.

Ka taea te whakamahi i te whakatau ahakoa he mea tuhituhi, he mea kōrero rānei te kirimana hanga.

Me whakatau te kaiwhakawā mēnā he kawenga tā tētahi o ngā rōpū ki tētahi kirimana hanga (ka whai kawenga rānei mēnā ka tutuki ētahi tikanga) ki te utu i raro i taua kirimana, me ngā pātai e tautohetia ana mō ngā tika me ngā herenga o ngā rōpū i raro i taua kirimana.

He mea here te whakataunga a te kaiwhakawā ki ngā rōpū, ki te kore e whakatauhia te tautohe mā te whakatau tautohe, mā ngā tukanga a te kooti rānei, e whakatauhia rānei mā te whakaaetanga, mā te takawaenga rānei i muri i te whakataunga a te kaiwhakawā i te tautohe.

Ki te kore tetahi rōpū i whakatauhia e te kaiwhakawā e tutuki i te whakataunga a te kaiwhakawā, ka taea e te rōpū i whakatauhia hei painga mōna te whakahoki mai i te rōpū e tika ana, i roto i tētahi kōti, te moni kāore anō kia utua me ngā utu whakahoki tuturu me te tika i whakawhiwhia e taua kōti, te whakamutu i te mahi whakaheke, te tono rānei kia whakamanahia te whakataunga mā te whakaurunga hei whakataunga i roto i te Kōti Takiwā.

Ka āhei te kaiwhakawā, i raro i ētahi āhuatanga, te whakaae i te tukunga o tētahi ota utu mō te papa hangahanga nō tētahi rōpū ki te kirimana hangahanga e whakawakia ana i roto i tētahi whakataunga, he hoa rānei nō taua tangata.

I raro i te Ture, ko te whakaaro me utu e ngā rōpū e whai wāhi ana ki te whakatau ā rātou ake whakapaunga me ā rātou whakapaunga, ā, me tohatoha ōrite te utu o te whakatau.

Ko wai ka taea te whakamahi i te whakatau?

E pā ana te Ture ki ngā kirimana hanga katoa e pā ana ki te whakahaere i ngā mahi hanga i Aotearoa, engari he iti noa ngā tūponotanga. Ka taea e te rōpū e tautohe ana, e rerekē ana rānei ki tētahi atu rōpū o taua kirimana te tuku i taua tautohe ki te whakawakanga.

Ka taea e te kaitono (te rōpū e tuku ana i tētahi tautohe ki te whakatau) te whakarite i tētahi kaiwhakawā mō te Taraipiunara Tautohe Hanga Whare (BDT) i roto i ngā haora 24 o te tuku tono.

Kāore e hiahiatia ana e te kaitono te whakaaetanga a te kaiwhakautu ki te tono ki te BDT mō te whakatūnga o tētahi kaiwhakawa. Kāore e taea e te kaiwhakautu te whakaroa, te karo, te aukati rānei i te tukanga whakatau.

Ahakoa kei raro i tētahi atu tukanga whakatau tautohe, ka taea tonu te tuku i tētahi tautohe ki te whakawakanga (hei tauira: he kōti, he tukanga whakatau tautohe, he rūnanga whakatau rānei, he takawaenga rānei).

Te Taraipiunara Tautohe Hanga Whare

Ko BDT, he kaiwhakarato ratonga whakatau tautohe motuhake, ā-motu hoki mō te umanga hanga whare me te hanga whare i Aotearoa, kua neke atu i te 25 tau o te wheako ki te whakarato ratonga whakatau tautohe e whakahaeretia katoatia ana tae atu ki te whakatū kaiwhakawa me te whakahaere i ngā tukanga whakatau i roto i te neke atu i te 900 ngā whakatau i raro i te Construction Contracts Act 2002 (te Ture).

He Mana Whakaingoa Whaimana (ANA) a BDT i whakamanahia e te Minita mō te Hanga Whare me te Whare hei whakatū kaiwhakawa hei whakatau i ngā tautohe e puta ake ana i raro i ngā kirimana hangahanga mā te whakatau i raro i te Ture.

He aha ai te take e whakamahia ai te ratonga whakatau a te Building Disputes Tribunal hei whakatau i tētahi tautohe mō te hanga whare, mō te hanganga rānei?

Neke atu i te 30 tau te wheako o BDT ki te whakarato ratonga whakatau tautohe motuhake e whakahaeretia katoatia ana ki te umanga hanga whare me te hanga whare.

He 'rēhita' tūmataiti a BDT, ā, kua whakatūria e ia ngā kaiwhakawā, ā, kua whakahaerehia hoki ngā tukanga whakatau i roto i te neke atu i te 900 ngā take whakatau i raro i te Ture.

Mō ngā tau 10 kua pahure ake nei, kua whakataua e ngā kaiwhakawa BDT tata ki te 85% o ngā tautohe hanga whare katoa e pā ana ki te whakatau i ia tau i Aotearoa.

Mā te pōwhiri anake ka tīpakohia ngā kaiwhakawā o BDT hei whakauru atu ki ngā rōpū kaiwhakawā o BDT. He tino whakangungua rātou, he pūkenga, he wheako, he mātau hoki ki te ture me te mahi hanga, ā, e whakautehia ana, e mōhiotia ana hoki hei kaiārahi i roto i te whakatau tautohe hanga i Aotearoa me te ao whānui.

Kei a BDT ngā kaiwhakawā, ngā kaiwhakatau, ngā tohunga, ngā kaiaromatawai, ngā kaiāwhina me ngā takawaenga kei Aotearoa, Ahitereiria, te UK me ētahi atu whenua o te ao katoa, kia taea ai te whakarato i te pūtake whānui o te tohungatanga, te wheako, te mana motuhake me te kore whakaaro tōkeke.

Ko ia whakataunga a te kaiwhakawā BDT ka 'tirotirohia' e tētahi o ngā kaiwhakawā matua o BDT i mua i te tukunga atu ki ngā rōpū. Mā tēnei tikanga whakapūmau kounga ahurei ka waiho te ratonga whakatau a BDT hei pūnaha whakatau pono rawa atu o Aotearoa.

Ka whakaratohia e ngā kairēhita mātau o BDT he ratonga whakahaere take me te whakahaere take tino whai hua, whānui, me te ngaio mai i te mutunga ki te mutunga. Ka āwhina ngā kairēhita i ngā rōpū ki te mārama ki te tukanga whakatau, ā, ka tirotiro me te whakahaere i te tukanga whakatau mai i te whakatūnga o te kairēhita ki te tukunga o te whakataunga. Mā tēnei ratonga rehita tino whai hua ka whakarite kia tino pono, kia ōrite, kia kounga hoki te tukunga o te ratonga whakatau a BDT.

He aha ngā āhuatanga nui, ahurei hoki o te ratonga whakatau a BDT?

Ko ngā āhuatanga nui, ahurei hoki o te ratonga ANA me te ratonga whakatau a BDT ko:

  • tauira pānui whakatau whaimana kore utu;
  • ratonga whakarite kore utu mō ngā haora 24;
  • ngā puka tono ipurangi watea;
  • ngā kaiwhakawā tino pūkenga, wheako, ā, whakautetia;
  • arotake ā-hoa i ngā whakataunga katoa; ā,
  • ngā ratonga utu pumau mō ngā kereme iti te uara (ngā kereme moni kei raro i te $50,000.00 kei raro i ngā tikanga).

Ka taea e au te tono mō te whakatūnga o tētahi kaiwhakawa?

Mena kua tukuna e koe he pānui whakatau ki te taha kē, ki ngā taha rānei o te kirimana hanga (ā, ki te tika mō te kaupapa o te whakatau, ki te rangatira o te papa hanga) ā, kua rite koe kia whakatauhia tō tautohe hanga mā te whakatau, whakakīia noa tā mātou puka tono ipurangi, ā, ka whakatūria e mātou he kaiwhakawa i roto i ngā haora 24. Kāore a BDT e utu i ngā taha mō tēnei ratonga whakatūnga.

Kia mōhio mai: me tuku he tono mō te whakatūnga o tētahi kaiwhakawā i roto i te wā i waenganui i ngā rā mahi e rua ki te rima i muri i te tukunga o te pānui whakatau ki ngā rōpū kē atu o te whakatau (ki te kore e puta he rā kore mahi ā-ture, ki te tukuna te pānui i te Rāhina, kāore e taea e koe te tuku i tō tono ki a BDT tae noa ki te Rāapa, Rāpare, Rāmere rānei o taua wiki, te Rāhina rānei o te wiki e whai ake nei; ki te tukuna te pānui i te Rāmere, kāore e taea e koe te tuku i tō tono ki a BDT tae noa ki te Rātū, Rāapa, Rāpare, Rāmere rānei e whai ake nei).

Whakapā mai

Whakakīia te puka hei whakapā atu ki tā mātou tīma kia kite ai me pēhea mātou e āwhina ai, e whakapā mai rānei ki a mātou mō tētahi o ēnei e whai ake nei:

Waea: +64 9 486 7143

Waea Koreutu: 0508 WHARE

Waea Koreutu: 0508 284 534

Ngā Hāora Tari: Mane ki te Paraire 8:30 i te ata ki te 5:00 i te ahiahi (haunga ngā hararei tūmatanui)

Whakapā mai

Ētahi atu rauemi ka pai pea ki a koe

Mena i kitea e koe he whai hua tēnei tuhinga, ā, kei te hiahia koe ki te ako atu, he nui ngā rauemi kē atu kei runga i tā mātou paetukutuku. He whānuitanga ā mātou tuhinga me ngā aratohu mō ngā kaupapa maha, kua hangaia ia tuhinga hei whakarato i te māramatanga hohonu ake ki a koe mō te kaupapa. Ka akiaki mātou i a koe kia tūhuratia ēnei rauemi me te whakahōhonu ake i tō mōhiotanga.

Te Whakatikatika i te Raina Hiko
Whakataunga

Kia marino, kia haere tonu: Kua hurihia e te Kōti Pīra o Ingarangi te whakataunga tautohenga a te Kōti Matua, ā, kua whakamāramahia ngā mātāpono ārahi i roto i ngā whakataunga raupapa

I puta te āwangawanga i te Kōti Matua o Ingarangi i te tīmatanga o tēnei tau i tana whakatau i takahia e te kaiwhakawā te tika tūturu mā te pupuri i a ia anō kia herea e...
Whakataunga

I ara ake ngā tautohetohe mō te whakakorenga me te aukati i roto i te tautohe utu wā poto

Kua whakamāramahia e te keehi a te Kōti Pīra o Ingarangi mō A & V Building Solutions Limited v J & B Hopkins Limited ngā take e pā ana ki ngā rōpū...